My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 2:21:21 PM
Creation date
10/21/2019 1:51:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
representative to determine if mechanical anchoring is required. <br /> Each jobsite has varying soil and water conditions. It is the <br /> Unpaved responsibility of the tank owner and its technical representative <br /> �. . . 4 in. reinforced concrete to determine actual size and thickness of either the concrete <br /> anchor pad or concrete deadmen used at a specific jobsite. <br /> n..:` Some installations will be considered"wet hole areas"where the <br /> water table must be kept at the lowest possible level in the <br /> excavation by pumping out water with or without a well point <br /> system. <br /> Consult "filter fabric" section of these installation instructions <br /> to determine if filter fabric is necessary. <br /> In the event water is used to fill or "ballast" the tank so <br /> installation can be accomplished, the following guidelines <br /> apply: <br /> •After tank is placed in hole add enough water to sink <br /> 77 <br /> tank. <br /> • Water level inside tank should be approximately the same <br /> level as water outside the tank. <br /> TANK ANCHORING, • In no event shall the water inside the tank be more than <br /> HIGH WATER TABLE 12" above the water level outside the tank. <br /> •Backfill excavation with pea gravel or crushed stone <br /> High water tables or water entering tank excavation will create making sure to push backfill under the bottom 120 <br /> significant uplift or buoyant force on underground tanks. These degrees section of tank to maintain proper support of <br /> buoyant forces can be partially overcome by the tank's weight, tank <br /> weight of backfill used and the amount of pavement or <br /> reinforced concrete applied over tank. Modern Welding Company publishes a guideline of holddown <br /> strap sizes based on tank's capacity and diameter. Refer to this <br /> When additional buoyant restraint is required, flat metal guideline when determining number of anchor points required <br /> holddown straps used in conjunction with concrete deadmen or for concrete pad or deadmen use. Holddown straps in <br /> concrete holddown pads maybe used. conjunction with backfill weight and concrete pad or deadmen <br /> When holddown straps are used, an inert dielectric isolation design work together to overcome the buoyant force of the <br /> material is required to separate the tank's exterior surface from underground tank. Once tank and holddown straps are installed <br /> the flat metal holddown strap. This isolation material should be it is imperative to apply remaining compacted backfill over tank <br /> shipped with the holddown straps from the tank manufacturer. before water has a chance to enter the excavation. <br /> The holddown strap guideline is for information only. Final <br /> anchoring system should be designed by approved engineer <br /> qualified in the area of soils and structural strengths of steel and <br /> THE USE OF STEEL concrete. <br /> CABLE AND ROUND BAR <br /> AS HOLD DOWN STRAPS Filter Fabrics / <br /> IS PROHIBITED Unstable Soil Environments <br /> When tank installations are subjected to the following <br /> conditions,filter fabric is required to prevent backfill migration. <br /> •Excavation Area is subjected to frequent ground water <br /> level changes. <br /> •Excavation is in a Tidal Area. <br /> •Excavation is in a swampy area were bog, muck, peat or <br /> where other soft expansive clay type, unstable soils are <br /> CAUTION: Never use steel cables or round bar as holddown present. <br /> strap material. This configuration of holddown will cut into and • Soils that have less than 750 lbs./sq.ft. cohesion and a <br /> damage exterior protection coating of your underground storage ultimate bearing capacity of 3500 lbs/sq.ft. are considered <br /> tank unstable excavations. <br /> Soil conditions, ground water and storm water runoff must be When filter fabric is used, clean sand is not an acceptable <br /> considered when anchoring tanks. backfill material, only crushed rock or pea gravel may be used. <br /> It is the responsibility of the tank owner or tank owner's Minimum bedding depth for backfill under tank in these <br /> conditions shall be 18". <br />
The URL can be used to link to this page
Your browser does not support the video tag.