Laserfiche WebLink
OPCkUIN,•.0 <br />2,• �_,_ :2 AN .IOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />U)'. < 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />Cq�%FpR�`P <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />o� <br />AAO-� <br />Inspection Date: <br />:3 ✓ 6 /2 0 � 5 <br />Facility Address: <br />$5 <br />le. �,r.��m o-r-�, Seo ��-�rn'' <br />Service Request #: <br />s X o o-7 / 33 5 <br />Onsite Service Technicia ' <br />-Toe &416 <br />Name: <br />ICC Service Technician/Installer Exp. Date: <br />Manufacturer Training: (,v <br />V11Z2�16 4 z %16 <br />SERVICE <br />r <br />eak detector <br />V1 mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />I <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />'t This UST facility is APPROVED to operate <br />SERVICE <br />r <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />I <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />Other: see below Res ARM <br />❑ This T facility is NOT APPROVED to operate <br />EHD 23-04 V7 / // V <br />Rev 4/30/12 ,/// <br />UST SERVICE REQUEST INSPECTION REPORT <br />r <br />/ 1W <br />in I'll i/ <br />I <br />EHD 23-04 V7 / // V <br />Rev 4/30/12 ,/// <br />UST SERVICE REQUEST INSPECTION REPORT <br />