Laserfiche WebLink
SWRCB, January 2002 <br />9_ CPTT.T./OVF.RFTT,T. CONTAINMENT BOXES <br />Page of <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested X <br />(See Comments Below!) SFP _ 014 <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer <br />❑ Other (Sped) <br />Industry Standard Professional Engineer <br />ENVIRONIVIEWAL HEALTH! <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Sped) <br />Vacuum ❑ I� AFAWENT <br />Test Equipment Used: <br />Bucket Diameter: <br />Equipment Resolution: <br />Spill Box # Spill Box # Spill Box # Spill Box # <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />startin test: <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Comments — (include information on repairs made prior to testing and recommended follow-up for farted tests) <br />Spill./Overfill Boxes tested annually with Monitoring System Certification. <br />