My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO 2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 3:52:53 PM
Creation date
10/21/2019 3:25:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB.January 2002 <br /> Page 3 of 7 <br /> BEACON FOOD SHOP <br /> 2185 E.Fremont St. <br /> Stockton,CA 95205 <br /> 10.27.04 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: [ ]Piping Manufacturer [X] Industry Standard [ ]Professional <br /> Engineer <br /> [ ] Other(Spec) <br /> Test Method Used: [X]Pressure [ ]Vacuum [ ] Hydrostatic <br /> [ ] Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0.20 <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run Piping Run <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron <br /> Piping Diameter: 2" 2" 2" <br /> Length of Piping Run: 100' Estimate 150'Estimate 150' Estimate <br /> Product Stored: DIESEL Super Unleaded Regular Unleaded <br /> Method and location of TEST BOOTS TEST BOOTS TEST BOOTS <br /> i in -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN. 5 MIN. 5 MIN. <br /> starting test: <br /> Test Start Time: 9:45 A.M. 10:00 A.M. 10:10 A.M. <br /> Initial Reading(RI) 5 P.S.I. 5 P.S.I. 5 P.S.I. <br /> Test End Time: 10:45 A.M. 11:15 A.M. 12:05 P.M. <br /> Final Reading f): 5 P.S.I. 5 P.S.I. 5 P.S.I. <br /> Test Duration: 1 HOUR 1:15 MIN. 1:55 MIN. <br /> Change in Reading(Rf-RI) -0-Change in 1 -0-Change in 1 -0-Change in 1 <br /> Hour Hour Hour <br /> Pass/Fail Threshold or -0-Drop -0-Drop -0-Drop <br /> Criteria: <br /> Test Result: IXI Pass[ I Fail 1X) Pass [ I IX] Pass I I Fail I I Pass I I I I Pass I I Fail <br /> Fail Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.