Laserfiche WebLink
Density: 6 to 10 primary dwelling units allowed per gross acre. <br /> • The project site consists of two (2) parcels totaling 0.48 gross acres, which will <br /> allow a maximum of four (4) dwelling units on the project site. <br /> Minimum Lot size: 6,000 square feet. <br /> • The project site consists of two(2) parcels, each greater than 6,000 square feet. The <br /> underlying project is a Small Multi-Family residential development,which will result <br /> in a maximum of four(4) units on the project site. <br /> Service Requirements <br /> WATER <br /> General Plan 2035 Policy Document Water Treatment and Delivery Policy IS-5.2 (Page 3.2-36) <br /> The County shall require the minimum standards for water system improvements provided in <br /> Table IS-1 for the approval of tentative maps and zone reclassifications. <br /> General Plan 2035 Policy Document Table IS-1 (Page 3.2-371 <br /> New projects in urban communities shall be served by public water systems. <br /> • The project site is under the jurisdiction of the Mokelumne Acres Municipal District. <br /> The applicant has submitted a "will serve" letter from the San Joaquin County <br /> Public Works Department, which oversees the District, confirming the availability <br /> of water for the project site. <br /> WASTEWATER <br /> General Plan 2035 Policy Document Wastewater Treatment and Disposal, Policy IS-6.4 (Page <br /> 3.2-38) <br /> The County shall require the minimum standards for wastewater system improvements <br /> provided in Table IS-2 for the approval of tentative maps and zone reclassifications. <br /> General Plan 2035 Policy Document Table IS-2 (Page 3.2-39) <br /> New projects in urban communities shall be served by a public sewer system. Onsite <br /> wastewater treatment system may be permitted in Rural Residential areas, Commercial areas <br /> adjacent to Rural Residential areas, and in Warehouse Industrial zones, if General Plan <br /> policies and Development Title regulations are met. <br /> • The project site is under the jurisdiction of the Woodbridge Sanitary District(WSD). <br /> The applicant submitted a letter from WSD confirming adequate sewer and <br /> treatment capacity to serve the proposed development. WSD can issue a "Will <br /> Serve Permit" upon submittal of construction design plans. <br /> STORMWATER <br /> General Plan 2035 Policy Document Stormwater Drainage Policy IS-7.2 (Page 3.2-41) <br /> Planning Commission Staff Report, Item #1 12/05/2019 — PA-1900037, 31 (GP, ZR) 5 <br />