Laserfiche WebLink
-3- <br /> Community Development Department <br /> PA-1900178 (SA) <br /> reports shall be maintained on the construction site and be available for review upon request. <br /> The post construction chapter of the SWPPP must identify expected pollutants and how they <br /> will be prevented from entering the storm system. The chapter shall also contain a <br /> maintenance plan,a spill plan,and a training plan for all employees on proper use,handling <br /> and disposal of potential pollutants. <br /> d. Owner shall be responsible for providing the County with an annual report of operation and <br /> maintenance of any system.The property owner shall also be responsible for the payment <br /> to the County of an annual system inspection fee established by Resolution of the Board of <br /> Supervisors. <br /> e. A Maintenance Plan shall be submitted and the execution of a Maintenance Agreement <br /> with San Joaquin County will be required for the owner/operator of stormwater controls <br /> prior to the release of the building permit. <br /> f. Standard Best Management Practices,for the type of development proposed, shall be <br /> incorporated into the site design. <br /> g. Wastewater shall NOT be allowed into the storm drainage system. <br /> h. All new construction and the substantial improvement of any structure in the area of special flood <br /> hazard shall be elevated or floodproofed in accordance to San Joaquin County Ordinance Code <br /> Section 9-1605.12(a)b,(b)and(c). <br /> AC:CH <br />