Laserfiche WebLink
-2- <br /> Community Development Department <br /> PA-1900178 (SA) <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> 4. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application.The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> 5. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee <br /> is due and payable prior to issuance of the building permit. The fee will be based on the current <br /> schedule at the time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval,prior to <br /> release of building permit. (Development Title Section 9-1135) <br /> 8. The frontage improvements for Piccolo Road shall be constructed in conformance with the <br /> standards for one-half of a 60-foot wide right-of-way Local Industrial road.The improvements shall <br /> be in conformance with the current Improvement Standards of the County of San Joaquin. <br /> Improvement plans,specifications and engineer's estimate prepared by a registered civil engineer <br /> shall be submitted for review and are subject to plan check,field inspection fees and must be <br /> approved by the County of San Joaquin Department of Public Works prior to issuance of the <br /> building permit. (Development Title Section 9-240, Section 9-910, Section 9-1100 and R-92-814) <br /> 9. This project falls within the definition of a Regulated Project as defined in either the County Post- <br /> Construction Standards Manual or the County Phase I National Pollutant Discharge Elimination <br /> System(NPDES)permit and shall comply with the following conditions: <br /> a. A registered professional engineer shall design a system or combination of systems to treat, <br /> filter or infiltrate the 85th percentile storm as defined in the County's Post-Construction <br /> 2009 SWQCCP.The system design shall follow standards as outlined in the 2009 Storm <br /> Water Quality Control Criteria Plan and comply with the conditions of the County Phase I <br /> NPDES permit.Plans and/or calculations of the proposed system shall be submitted to the <br /> County for review and approval prior to clearance for plan check. <br /> b. All Priority New Development and Significant Redevelopment Projects must meet the <br /> volume reduction requirement outlined in the County's SWQCCP. <br /> c. Applicant shall submit a"Storm Water Pollution Prevention Plan"(SWPPP)to Public Works <br /> for review.A SWPPP preparation guide is available at the Department of Public Works. A <br /> copy of the approved SWPPP and all required records,updates,test results and inspection <br />