Laserfiche WebLink
=ESSMENT, <br /> Page 6 <br /> January 29, 2019 <br /> PC Project Number 2018-10-038 <br /> analysis. <br /> -Nitrate as Nitrogen,Total Kjeldahl Nitrogen, Total Dissolved Solids, pH, Fixed Dissolved Solids <br /> and standard minerals were analyzed. <br /> Condition of the Monitoring Wells <br /> The monitoring wells were inspected during the initial unlocking of the monitoring wells and <br /> appear to be in good condition. <br /> Monitoring Well Depth Gauging <br /> After checking the integrity of the monitoring wells,the monitoring wells were opened and allowed <br /> to equalize with the atmosphere prior to gauging the depth-to-water. Each of the monitoring wells <br /> were gauged for depth-to-water and total depth of the monitoring well casing. The depth-to-water, <br /> casing elevation, groundwater elevation, groundwater flow direction and gradient are located in <br /> Table 1. <br /> Table 1. Monitoring Well Gauging Information from December 20, 2018. <br /> Well# Reference Depth to Groundwater Depth of Direction of Gradient <br /> Elevation Groundwater Elevation monitoring Flow (ft/ft) <br /> (ft) (ft) (ft) well(ft) <br /> MW-1 43.21 55.40 -12.19 60.91 <br /> MW-2 45.64 58.09 -12.45 62.50 S 46 E 0.0004 <br /> MW-3 44.17 57.11 -12.94 62.7 <br /> Based on the groundwater data collected during the sampling event, groundwater flow direction <br /> was measured to be S 46 E with a calculated gradient of 0.0004 feet per foot. This is similar to <br /> past events at this facility. <br /> ENVIRO ASSESSMENT,PC ENVIRONMENTAL•ENGINEERING•GEOLOGY <br /> PHONE (844)742-7311 FAX (877)623-5493 <br />