Laserfiche WebLink
Ms. Barbara G. Russell <br /> August 1, I996 <br /> Page 2 <br /> 2. the description of the site; <br /> 3. the location and depth of sampling points, and a map depicting the <br /> locations; <br /> 4. methods and procedures of sample collection and decontamination; <br /> 5. Quality Assurance/Quality Control (QA/QC)protocols; <br /> 6. analytical methods and laboratory QA/QC measures; <br /> 7. waste generation and disposal; and <br /> S. local permitting requirements. <br /> ' The workplan must be signed by a registered engineer/geologist licensed <br /> in the State of California. ASPI, or their engineering consultant, is required to <br /> contact the DISC in writing within fifteen(15) days from the daze of this letter <br /> ' confuming your intent to conduct the investigation. The investigation workplan <br /> shall be submitted within thirty(30)days from the date of this letter. <br /> Failure to comply with the above requirements may result in the DTSC <br /> taking administrative action which could subject ASPI to fines and penalties for <br /> ' noncompliance. <br /> If you have any questions regarding this matter, I can be contacted at <br /> (916) 327.2524. <br /> /15v) 0'I0� Sincerely, <br /> �z q Z2 <br /> Barry C. Padilla <br /> Hazardous Substances Scientist <br /> Regional Groundwater <br /> Remediation Unit <br /> cc: See Page 3 <br />