My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
212
>
2900 - Site Mitigation Program
>
PR0506145
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 11:02:46 AM
Creation date
11/12/2019 10:33:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506145
PE
2950
FACILITY_ID
FA0007226
FACILITY_NAME
BECKMAN BUILDING
STREET_NUMBER
212
Direction
W
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95241
APN
04303203
CURRENT_STATUS
01
SITE_LOCATION
212 W PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Employees will follow a route that avoids locations downwind from the emergency. If emergency <br /> exits are used, employees will proceed to the assembly area by the quickest route possible, <br /> staying close to the perimeter of the Exclusion Zone. When the assembly area is reached, <br /> employees will immediately check in with the SSO or FSSO. The site will remain evacuated <br /> until the all clear signal has been given. <br /> Onsite emergency equipment will include equipment used during operations (heavy equipment) <br /> and reserved items stored at the decontamination/ assembly area and at strategic areas onsite. <br /> The following is a list of emergency equipment available: <br /> Portable emergency eye wash <br /> Tarps/space blankets to reduce contamination potential while transporting injured <br /> personnel to medical facilities. <br /> Twenty-pound ABC fire extinguishers <br /> Emergency escape SCBAs <br /> First-aid supplies <br /> 4 <br /> Absorbent-spill control <br /> Extra batteries for radios, monitoring equipment, etc. <br /> All personnel will have a thorough understanding of the Emergency Response Plan before <br /> starting work. It will be rehearsed regularly and reviewed periodically to keep it current with new <br /> or changing site conditions or information. <br /> In the event of personal injury, first-aid personnel must decide if the victim's injuries are <br /> potentially the type that would be aggravated by movement. If there is any doubt, or the victim <br /> is unconscious and cannot respond, no attempt should be made to move the victim to the <br /> decontamination area. Only offsite paramedics may move such victims. If the paramedics <br /> approve, the victim's protective equipment will be cut off in the decontamination Reduction <br /> Zone. If the decision is made not to remove the victim's protective clothing, he or she will be <br /> wrapped in a tarp or similar object to protect the ambulance and crew during transportation. If <br /> the victim is contaminated with materials that threaten to cause additional injury or immediate <br /> health hazards, the personal protective equipment shall be carefully removed and the victim <br /> washed appropriately. Routine and emergency communication will be provided by the site <br /> telephone. <br /> 317198 3:09 PM 10 952704.01 <br /> g:jobs\952704.01\hUplan.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.