Laserfiche WebLink
Mr. Jeff Gymer <br /> Draft Post-Remediation Soil Gas Probe Destruction Workplan <br /> Former Lodi MGP Site <br /> December 17, 2015 <br /> SCHEDULE <br /> Upon receiving approval of this Workplan, the soil gas probe destruction activities outlined above <br /> will be initiated. We are tentatively scheduling the work to begin in early February 2016. <br /> CLOSING REMARKS <br /> If you have any questions, or need additional information concerning the scope of work outlined <br /> above,please do not hesitate to call me at (949) 297-4444,extension 223. <br /> Respectfully submitted, <br /> Terra Pacific Group Incorporated 55`Ot4AL°Foy <br /> 2G' OWN <br /> / RAUL A BRIONES <br /> No.6544 <br /> Ra . Brio es,PG <br /> Project Manager pfi <br /> ' 9� CAL O� <br /> Enclosures: <br /> Figure 1 —Site Location Map <br /> Figure 2—Site Plan Showing Post-Remediation Soil Gas Wells to be Destroyed <br /> Attachment A—Soil Boring Logs with Well Construction Details <br /> cc: Sharron Reackhof,Pacific Gas and Electric Company <br /> Max Reyhani,Terra Pacific Group <br /> TERRA PACIFIC GROUP Page 4 <br />