My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
40
>
2900 - Site Mitigation Program
>
PR0518875
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 4:04:13 PM
Creation date
11/12/2019 3:19:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518875
PE
2960
FACILITY_ID
FA0014182
FACILITY_NAME
FORMER BUSY BEE CLEANERS
STREET_NUMBER
40
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
40 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br /> Lodi Settlement Meeting <br /> April 29, 1996 <br /> Page 2 <br /> 6 . Guild will meet with DTSC on May 3 , 1996 to discuss soil gas <br /> sampling locations in the alley. DTSC specifies that, at a <br /> minimum, soil gas sampling shall be conducted in the alley <br /> from Church Street to Lee Street . The 1994 URS report and <br /> 1996 report prepared by Northeast Research Institute (NERI) <br /> indicate the presence of extremely high levels of <br /> tetrachloroethene (PCE) in soils at and downgradient of <br /> Guild' s sewer discharge point in the alley. <br /> 7 . Busv Bee will enter into an agreement with DTSC as soon as <br /> Busy Bee obtains (a) the final soil remediation cost <br /> estimate from the consultant; (b) clarifications from DTSC <br /> on the NERI report; and (c) City' s sewer video survey <br /> results on Busy Bee' s sewer lines . Busy Bee will provide <br /> DTSC with the final SVE workplan in two weeks . A letter <br /> requesting clarification on NERI' s March 1996 report will be <br /> sent to DTSC within a week. <br /> 8 . Busy Bee may separate from Lustre-Cal and Guild to pursue <br /> settlement with DTSC rather than the joint agreement that <br /> has been discussed in the past . Busy Bee is prepared to <br /> enter into an agreement with DTSC by June 1996 . <br /> 9 . DTSC will provide Private Settling Parties with a breakdown <br /> of the past cost and an estimate of future oversight costs . <br /> 10 . DTSC agrees to extend the April 30 , 1996 deadline to June 1, <br /> 1996 for the commitment from Busy Bee to conduct soil <br /> remediation at their site . <br /> If you have any questions, please call me at (916) 323-3372 , <br /> or Mr. Jerry Marcotte at (916) 322-9224 - <br /> Sincerely, <br /> Jean Young <br /> Project Manager <br /> Regional Groundwater Remediation Unit <br /> Attachment <br /> File : lodil/meeting.not <br />
The URL can be used to link to this page
Your browser does not support the video tag.