My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
40
>
2900 - Site Mitigation Program
>
PR0518875
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 4:04:13 PM
Creation date
11/12/2019 3:19:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518875
PE
2960
FACILITY_ID
FA0014182
FACILITY_NAME
FORMER BUSY BEE CLEANERS
STREET_NUMBER
40
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
40 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R <br /> TOPICS TO BE INCLUDED IN A SITE ASSESSMENT REPORT <br /> SUBMITTED TO THE REGIONAL BOARD'S <br /> WELL INVESTIGATION PROGRAM <br /> As a minimum, the following topics should be discussed in the text of all site <br /> assessment reports submitted to the Regional Board' s Well Investigation Program. <br /> Other supporting data to be included in the report, either within the text of the <br /> report or in Appendices, are italicized at the end of each section. All reports <br /> should be signed by a registered geologist, certified engineering geologist, or <br /> civil engineer registered or certified by the State of California. <br /> I. INTRODUCTION <br /> Purpose of the investigation <br /> Scope of the investigation <br /> Time period in which the investigation was carried out <br /> II. SUMMARY <br /> Number of wells drilled <br /> Results of soil and water analyses <br /> Ground water flow direction and gradient <br /> Possible source determination <br /> III. FIELD INVESTIGATION <br /> Well Construction <br /> Number and depth of wells drilled <br /> Date(s) wells drilled <br /> Description of drilling and construction <br /> Approximate locations relative to facility site(s) <br /> Supporting Data: <br /> A We I 1 Construction Diagram for each we 11 shoo Id be inc luded in the <br /> report which shows the fo I lowing deta i Is: <br /> Tota 1 depth dri l led <br /> Depth of open hole (same as total depth drilled if no caving occurs) <br /> Footage of hole co I lapsed <br /> Length of slotted casing insta 17ed <br /> Depth of bottom of casing <br /> Depth to top of sand pack <br /> Thickness of sand pack <br /> Depth to top of bentonite sea 1 <br /> Thickness of bentonite sea 1 <br /> Thickness of concrete grout <br /> Boring diameter <br /> Casing diameter <br /> Casing material <br /> Size of perforations <br />
The URL can be used to link to this page
Your browser does not support the video tag.