Laserfiche WebLink
Proiect Number 1804BK54 April 11,2013 <br /> equipment or materials <br /> Safety Procedures <br /> Site control measures will be utilized to protect the community from potentially <br /> hazardous conditions. Measures will be taken to prevent the public from entering the <br /> work area by establishing a barricade perimeter connected by highlighted caution <br /> tape. Equipment that may pose a hazard if not utilized properly will be secured and <br /> safely stored. <br /> Access to the work area will be limited to authorized personnel. Only E2C employees, <br /> its subcontractors, and representatives of associated regulatory agencies will be <br /> admitted to the immediate work area. These personnel will be required to review the <br /> SSP and present proof of their 40-hour HAZWOPER certification or current 8-hour <br /> refresher. A visitor sign-in sheet will be maintained to document visitors not working <br /> at the Site. The SSO will be responsible for ensuring that personnel wear the <br /> appropriate Level of PPE for existing site conditions. Each visitor will be required to <br /> sign the SSP as proof of their understanding of the provisions of the SSP. <br /> Documentation will be kept on personnel exposed to contaminant hazards on the job <br /> site according to OSHA regulations. These will include documentation that employees <br /> received training on the SSP, respiratory protection, and all emergency procedures. <br /> These will be reviewed during the pre-site training meeting conducted by the SSO. <br /> Exposure records for the project will be kept for 30 years to meet requirements. <br /> Included will be names and social security number of employees, on-the-job logs from <br /> entry to exit, first aid administered, site visits by outside persons, and personal air <br /> monitoring records. <br /> The SSO will conduct daily/pre-shift tailgate meetings to review safety and health <br /> issues for the day's activities and to provide a means for discussion of potential <br /> hazards identified by the field personnel. Attendance at these meetings is mandatory <br /> and issues discussed will be documented on Tailgate Safety Meeting forms that will <br /> include a list of all attendees and their signatures. A copy of the standard Tailgate <br /> Safety Meeting form is provided in Appendix A of the SSP. <br /> Work Zone Procedures <br /> The work areas for this project are located on two private properties and within City of <br /> Lodi right-of-way in the alley bordered by Stockton and Main Streets and Elm and <br /> Pine Streets. As the equipment setups will occur over a range of locations, the <br /> exclusion zones at each location will require an assessment of the surrounding area <br /> to determine the appropriate extent for demarcating these zones. The exclusion zone <br /> at each drilling location will be cordoned off by a set of barricades connected with <br /> yellow caution tape to discourage public access. This level of cordoning off the work <br /> area should be sufficient to protect the public from exposure to physical hazards. <br /> Workers will employ applicable steps according to the level of PPE worn. Disposable <br /> items will be properly disposed of in an appropriate container. Similar <br /> decontamination methods will be utilized for decontaminating field equipment though <br /> these may be supplemented by the use of a steam cleaner for grossly contaminated <br /> large equipment. Decontamination fluids will be temporarily stored on-site for future <br /> disposal at an appropriate facility. <br /> E2C Remediation Appendix A-7 <br />