Laserfiche WebLink
Proiect Number 1804BK54 April 11,2013 <br /> Contingency Procedures <br /> For emergencies requiring site evacuation, field personnel will signal distress with <br /> three (3) horn blasts. A vehicle horn will be sufficient for this purpose. <br /> Communication signals (e.g., hand signals) will be used in the event that loud noise <br /> precludes use of a horn. <br /> The SSO will be responsible for evaluating the degree of the emergency and notifying <br /> appropriate personnel. A list of emergency contacts and directions to the nearest <br /> hospital are provided in Section 10 of the SSP. The SSO will maintain a cellular <br /> telephone for use in case of an emergency. <br /> Injury and Illness <br /> Medical and emergency services of Lodi Memorial Hospital, 1235 West Vine Street, <br /> Lodi, California will be used in the event of a medical emergency. The medical <br /> emergency unit will be contacted via the 911 emergency phone number. TOXLINE <br /> (Ph: 301/496-1131) or the Poison Control Center (Ph: 800/876-4766) may be used as <br /> alternate emergency contacts for emergency chemical exposure or accidental <br /> ingestion. The SSO will maintain a cellular phone at his side that will be used in case <br /> of an emergency. A full list of emergency contacts is included in Section 10 of the <br /> SSP. The SSO will maintain current CPR/First Aid certification. <br /> Fire <br /> Fire emergency personnel (local fire department) will be contacted using the <br /> emergency phone number 911 in the event of a fire. Upon arrival of the fire <br /> department, the SSO will explain the nature of the fire, its location, and other <br /> circumstances that may affect the safety of the firefighters such as the potential for <br /> contact with chemically-affected media. Field personnel should not attempt to fight <br /> the fire unless they have been specifically trained and equipped to do so. <br /> Underground Utilities <br /> In the event that an underground utility line is ruptured during intrusive activities, <br /> the equipment will be shutdown and the nature of the utility will be determined. <br /> Upon making this determination, the SSO will contact the appropriate utility company <br /> so that repairs can be implemented. The SSO will also notify the Project Director or <br /> alternate Project Manager to advise of the situation. <br /> Evacuation <br /> Evacuation routes and personnel assembly locations will be designated by the SSO in <br /> the event that an emergency requiring evacuation arises. Evacuation routes will be <br /> selected by the SSO for each drilling location depending on the easiest means of <br /> egress for each location, therefore, a map showing evacuation routes has not been <br /> provided. Upon the need to evacuate the exclusion zone, workers will exit through <br /> the contamination reduction zone (CRZ), where possible, and will stay upwind of any <br /> vapors or smoke and upgradient of any spills. If evacuation is not possible through <br /> the CRZ, then personnel will evacuate to the nearest safe location and remove PPE at <br /> that location or near the exclusion zone if possible. Evacuated personnel will <br /> assemble at a location predetermined by the SSO who will verify that all workers have <br /> been evacuated safely. <br /> Emergency Contacts <br /> Ambulance: 911 <br /> Fire: 911 <br /> E2C Remediation Appendix A-8 <br />