Laserfiche WebLink
1 <br /> Revised Recommendation (9-28-81) <br /> EIR-81-5/EP-81-9 <br /> Page 2 <br /> 7. Adequate, stockpiled overburden shall remain on-site to accomplish <br /> rehabilitation of the protion excavated to that date. The upper- <br /> most 24 inches of overburden, i.e. , the topsoil, shall be stockpiled <br /> separately from other overburden required for rehabilitation and <br /> shall, under no circumstances, be removed from the site . The <br /> topsoil shall be returned to the uppermost 24 inches of <br /> rehabilitated surfaces. <br /> 8. If the excavation work is to be accelerated, rehabilitation work <br /> shall be equally accelerated. <br /> 9. A faithful performance bond in the amount of $75, 000 shall be filed <br /> by the applicant with the County prior to the commencement of <br /> excavation. This bond shall be callable at all times during the <br /> project, either in whole or in part, upon request by the County. <br /> The bond shall specify its applicability to both excavation and <br /> rehabilitation work and to any other work that may be required as <br /> a condition of this permit. <br /> 10. Rehabilitation ef-rte-lea s-tl4arr-&sl9areas-la-an -been <br /> ear+g�etee�-]�Y-bye-end-ef-tl�e-�ea3eet-peae-3-3 f-exea�ratten-tee <br /> eerrt�n�tAg-at-tket-tn+e shall be completed upon schedule or sooner <br /> if excavation is accelerated. If not, been <br /> aeeomla-li-ahedr the County may require that the excavator cease all <br /> excavation, processing, and loading and hauling of materials until <br /> such rehabilitation is completed. eke-Baine-�rtrtegg�es-s�a��-ag�s�Y <br /> a�tk-regard-te-Subarea-�e-at-�+ear-3:ST-Sal9area-�a-{er-?b}-at-tYte <br /> crtd-ef-Year-4T-arte�-te-Ssbarea-�l9-{er-�a}-at-Year-4-5:--Area-3- <br /> vehab-i14!tattert-9ha11-Piave-been-eempleted-by-the-end-of- tear-b: <br /> 11. The applicant shall submit semi-annual reports to the Planning <br /> Department to verify the number of cubic yards removed in that <br /> pro3eet-Year the previous 6 month period. In no case shall the <br /> excavation, including <br /> tailings and overburden, exceed the cubic yardage approved by <br /> the decision-making body. <br /> 12. Dust and other particulate emissions will be controlled to the <br /> maximum extent feasible. A water truck shall be maintained on- <br /> site and daily sprinklings shall be applied to unpaved work routes <br /> and areas under excavation. The interior routes used by haul <br /> trucks shall be paved. Haul truck loads shall be sprinkled prior <br /> to departure from the site. <br /> 13. Equipment approved by the County Fire Warden shall be maintained <br /> in operable condition on-site for fire protection. <br /> 14. The applicant shall consult the Soil Conservation Service or the <br /> Agricultural Extension Service for reseeding recommendation and <br /> shall adopt these recommendations as part of the rehabilitation <br /> plan. A copy of the reseeding plan shall be submitted for review <br /> and approval by the Planning Department prior to the commencement <br /> of excavation. <br />