Laserfiche WebLink
PEA <br /> Quarry Excavations <br /> Page Three <br /> OPERATIONAL STATEMENT (Continued) <br /> State the type, depth and volume of overburden: <br /> Class IV soil-1-3 feet in depth <br /> Maximum working slopes: <br /> Areas to be fenced and the type of fencing: <br /> Excavation area to be fenced. Barb wire <br /> State what will be done with the overburden: <br /> Stored for use during rehabilitation phases. <br /> Describe any trees or vegetation to be removed: <br /> Natural grasses to be removed. No trees on property. <br /> If explosives will be used, explain: <br /> None <br /> Method and equipment used to remove material: <br /> Dozers, graders, skip-loaders, draglines, belly dumps" Euclids <br /> Days and hours of operation: <br /> As set forth in permit. <br /> If any canal, pipeline, railroad, etc. will be crossed, explain: <br /> dune <br /> Describe the haul route to the public road (state surfacing means <br /> of dust control) : <br /> Private road to public highway. Paved as set forth in permit. <br /> Describe the on—site processing: <br /> Material will be hauled to the processing area by bottom dump haul units, <br /> where it will be port through a scrubber tronmiel and then through a sand recovery <br /> unit :ind then through a log washer. from the log washer the material will pass <br /> List the equipment used: over a horizontal screen and then go to the <br /> product conveyors and into the stock piles. <br /> Dragline, shovel, haul units, loaders, tractors, water trucks, fire engine, <br /> trucks and tractors, scraper. <br />