Laserfiche WebLink
PEA <br /> • Quarry Excavations <br /> Page Four <br /> OPERATIONAL STATEMENT (Continued) <br /> Amount and source of water used: <br /> Well on site. <br /> State the method of water disposal: <br /> Disposal into settling ponds for reclamation. <br /> Describe the means of preventing water pollution and turbidity <br /> increases in ground and surface water: <br /> If the project adjoins any river course, levee, floodplain, or <br /> other water feature, describe the hydrology and proposed means <br /> of protecting the watercourse: <br /> N/A <br /> REHABILITATION <br /> Describe the ultimate condition and use of the property when <br /> the project is complete: <br /> Iuck ponds and grazing land. <br /> Describe the rehabilitation schedule . If the excavation will be <br /> conducted in phases, clearly describe the phasing. Attach charts, <br /> maps, or diagrams to show what operations will be conducted in <br /> each area during each phase: <br /> sec Permit <br /> State the proposed means of financially guaranteeing rehabilita- <br /> tion of the excavation: <br /> Bond has been posted <br /> Describe the final land contours and water features: <br /> Gently sloping to avoid erosion, generally less than 50 <br />