Laserfiche WebLink
r <br /> EQUIPMENT INSTAuL.?TION <br /> The catalytic incinerator, Pumping unit <br /> an <br /> water knockout device will be deli ered todthecsite <br /> ator/ <br /> installed on an existing concrete pad, and connected to the <br /> r extraction system already in place. <br /> OPERATION AND MAINT&TANCE <br /> Catalytic Incinerator Start-up <br /> The vacuum extraction Sys e?s operation will be initiated. <br /> The required source testing will be <br /> ' compliance with Permitted tined to ensure ' <br /> permitted emission cond=tions. Hydrocarbon <br /> concentration'iab,vapor aG each 'probe and: well will:,b6 <br /> recorded`to establish - <br /> the remediation. -a,-basal <br /> ineto `gauge';:.the,,progress. of <br /> Operation <br /> ' t <br /> lhz catalytic in will Op <br /> erate 24 hours per da <br /> seven days per week. Thee.., <br /> system wild._be,°ynoni.dored 'andY� <br /> adjusted or_,-a ,monthly-basis, Monitoring <br /> b <br /> E anal z� g will include <br /> Y rtg the influent hydrocarbon concentrations to <br /> document the progress of the remediation and compliance <br /> T <br /> sampling of,. the exhaust .stream to the atmosphere to en <br /> than system operation is within permitted emission sure <br /> conditions. ; The individual extraction'probes and wells will <br /> be monitored an a' monthly basis alsa .to document the <br /> Progress of the remediation. Extraction .at an individual <br /> probe or well will be discontinued when hydrocarbon vapor <br /> An <br /> concentration has been reduced in the vicinity of that pz°obe <br /> or well. . Vapor concentrations at each <br /> grou <br /> monitoring well not connected to the systemnwillebe <br /> 4 _ monitored at the monthly system monitoring. <br /> r` <br /> 4 <br /> Project Management and <br /> Reports . <br /> Project Management <br /> - - <br /> will coordinate the system monitoring, <br /> review the results .af the monitoring to ensure compliance <br /> with regulations and submit the data to the <br /> agency as required, and regulatory <br /> I ME <br /> prepare.brief monthly. reports for <br /> F Exxon that include the results of the monitoring. <br /> F <br /> .17 <br />