My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012713
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
909
>
3500 - Local Oversight Program
>
PR0544983
>
ARCHIVED REPORTS_XR0012713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 9:14:52 AM
Creation date
11/14/2019 4:59:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012713
RECORD_ID
PR0544983
PE
3528
FACILITY_ID
FA0005197
FACILITY_NAME
GARYS EXXON SERVICE STATION
STREET_NUMBER
909
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
909 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
774
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ s <br /> will; M <br /> 1 . INTRODUCTION <br /> At the request of Exxon Company, U.S.A. , EA has prepared the <br /> following work plan to install new groundwater monitoring wells <br /> at former Exxon Retail Site (RS) 7--1050 in Stockton, California. <br /> i <br /> EA proposes to replace three existing groundwater monitoring <br /> i - wells that have gone dry with the recent lowering of groundwater <br /> elevations in Stockton. The new wells will be installed in <br /> w accordance with all applicable regulations of San jc,aquin County <br /> °.J and the Regional Water Quality Control Board. <br /> i <br /> � 1 . 1 LOCATION AND SITE SETTING <br /> - The site is located at 909 West Hammer Lane, on the northwest. <br /> j corner of West Hammer Lane and bower Sacramento Road, Stockton, <br /> California (Figure 1 ) . The tanks, pump islands, associated <br />> Piping, and buildings were removed in early 1986 after the fuel j <br /> lines a_Lled a tightness test. The dirt surface of .the back- <br /> filled excavation has been graded. The concrete building slabs, <br /> landscaping, and much of the asphalt pavement remain intact. <br /> �-` The site is 'now -being rented as a vacant lot for seasonal "busi- <br /> ..f�. ness, ` such as the selling of pumpkins and Christmas trees, by Tim <br /> j Ambrose Enterprises {.n .Stockton. <br /> � lI Thesite is not secured by a fence, and a significant amount of <br /> vehicle traffic crosses the site to gain access from Hammer..Lane <br /> f tc: the shops behind the site. <br /> 1�x Land use in the immediate area is primarily commercial (Figure . <br /> jr <br /> 2). There is a: Shell service station with operational under- <br /> ground tanks across. Sacramento Road.to the east, and a 'retail <br /> shopping center:.surrounds the backside of the former station to <br /> the north and west. <br /> 60 <br /> e92/71050/7-90/tx 1 ' <br /> h I � <br />
The URL can be used to link to this page
Your browser does not support the video tag.