My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002121
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
909
>
3500 - Local Oversight Program
>
PR0544983
>
ARCHIVED REPORTS_XR0002121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 8:30:04 AM
Creation date
11/15/2019 8:18:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002121
RECORD_ID
PR0544983
PE
3528
FACILITY_ID
FA0005197
FACILITY_NAME
GARYS EXXON SERVICE STATION
STREET_NUMBER
909
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
909 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WED 12: 1' 11 JH.; TECH1110LOG I ES TEL N0,438 7; #498 P21 _... <br /> EQUIPMENT INSTALLATION <br /> The catalytic incinerator, pumping unit and &cc:: u'. :jtr/►, tar knockout <br /> device will be delivered to the site . i-4ta' 1ed or w,'I # A sling ccncret,� <br /> pad, and connected to the extraction sys-ertk already ; 7 p! <br /> OPERATION AND MAINTENANCE <br /> Catalytic Incinerator Start-up <br /> The vapor extraction system operation will be i►iitiated . In <br /> source testing will be performed to ensure corp, ' a <br /> emissi❑n conditions. Hydrocarbon concentration as yjpc�- at eac�, <br /> and well will be recorded to establish a baseline to <br /> of the remediation. ` <br /> OperationF <br /> The catalytic incinerator will operate 24 hours per day, seven days pe- r <br /> week. The system will be monitored and adjusted cn a -onthly basis . <br /> Monitoring will include analyzing the influent ;fce tr } <br /> y g hydroc�ro+�r� cu ��,�* aws,,,�� <br /> to document the progress of the remediation and compsidor-a sa;p' -> cn <br /> the exhaust stream to the atmosphere to ensure that system operet, c � ' s <br /> within permitted emission conditions. The individual extraction pr-)os�a <br /> and wells will be monitored on a monthly basis also to document tr.c <br /> progress of the remediation. Extraction at an individual probe or wk�" <br /> will be discontinued when hydrocarbon vapor concentration has Dreg <br /> reduced in the vicinity of that probe or well . Vapor concentratic�,ts is <br /> each groundwater monitoring well not connected to the system will be <br /> monitored at the monthly system monitoring. <br /> Project Management and Reports <br /> Project Management will coordinate the system monitoring, rev;e," tie � <br /> results of the monitoring to ensure compliance with Acu , atiors Ire <br /> submit the data to the regulatory agency as required, and prepare :�rlef l <br /> monthly reports for Exxon that include the results of the mons tcrir�g . � <br /> t <br /> -1 <br /> - 17 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.