My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
3900
>
2900 - Site Mitigation Program
>
PR0505422
>
SITE INFORMATION AND CORRESPONDENCE_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 1:40:39 PM
Creation date
11/15/2019 1:28:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0505422
PE
2965
FACILITY_ID
FA0006902
FACILITY_NAME
TRACY WASTEWATER TX PLNT
STREET_NUMBER
3900
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3900 HOLLY DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT E <br /> ORDER NO. R5-2007- <br /> REQUIREMENTS FOR <br /> MONITORING WELL INSTALLATION WORKPLANS AND <br /> MONITORING WELL INSTALLATION REPORTS <br /> Prior to installation of groundwater monitoring wells, the Discharger shall submit a workplan <br /> containing, at a minimum, the information listed in Section 1, below. Wells may be installed <br /> after staff approve the workplan. Upon installation of the monitoring wells, the Discharger shall <br /> submit a well installation report which includes the information contained in Section 2, below. <br /> All workplans and reports must be prepared under the direction of, and signed by, a registered <br /> geologist or civil engineer licensed by the State of California. <br /> SECTION 1 - Monitoring Well Installation Workplan and Groundwater Sampling and <br /> Analysis Plan <br /> The monitoring well installation workplan shall contain the following minimum information: <br /> A. General Information: <br /> Purpose of the well installation project <br /> Brief description of local geologic and hydrogeologic conditions <br /> Proposed monitoring well locations and rationale for well locations <br /> Topographic map showing facility location, roads, and surface water bodies <br /> Large scaled site map showing all existing on-site wells, proposed wells, surface <br /> drainage courses, surface water bodies, buildings, waste handling facilities, utilities, and <br /> major physical and man-made features <br /> B. Drilling Details: <br /> On-site supervision of drilling and well installation activities <br /> Description of drilling equipment and techniques <br /> Equipment decontamination procedures <br /> Soil sampling intervals (if appropriate) and logging methods <br /> C. Monitoring Well Design (in narrative and/or graphic form): <br /> Diagram of proposed well construction details <br /> - Borehole diameter <br /> - Casing and screen material, diameter, and centralizer spacing (if needed) <br /> - Type of well caps (bottom cap either screw on or secured with stainless steel <br /> screws) <br /> - Anticipated depth of well, length of well casing, and length and position of <br /> perforated interval <br /> - Thickness, position and composition of surface seal, sanitary seal, and sand <br /> pack <br /> - Anticipated screen slot size and filter pack <br /> D. Well Development (not to be performed until at least 48 hours after sanitary seal <br /> placement): <br /> Method of development to be used (i.e., surge, bail, pump, etc.) <br /> E-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.