My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
3900
>
2900 - Site Mitigation Program
>
PR0505422
>
SITE INFORMATION AND CORRESPONDENCE_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 1:40:39 PM
Creation date
11/15/2019 1:28:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0505422
PE
2965
FACILITY_ID
FA0006902
FACILITY_NAME
TRACY WASTEWATER TX PLNT
STREET_NUMBER
3900
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3900 HOLLY DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT E <br /> ORDER NO. R5-2007- <br /> REQUIREMENTS FOR MONITORING WELL INSTALLATION <br /> WORKPLANS AND MONITORING WELL INSTALLATION REPORTS <br /> Parameters to be monitored during development and record keeping technique <br /> Method of determining when development is complete <br /> Disposal of development water <br /> E. Well Survey (precision of vertical survey data shall be at least 0.01 foot): <br /> Identify the Licensed Land Surveyor or Civil Engineer that will perform the survey <br /> Datum for survey measurements <br /> List well features to be surveyed (i.e. top of casing, horizontal and vertical coordinates, <br /> etc.) <br /> F. Schedule for Completion of Work <br /> G. Appendix: Groundwater Sampling and Analysis Plan (SAP) <br /> The Groundwater SAP shall be included as an appendix to the workplan, and shall be <br /> utilized as a guidance document that is referred to by individuals responsible for conducting <br /> groundwater monitoring and sampling activities. <br /> Provide a detailed written description of standard operating procedures for the following: <br /> • Equipment to be used during sampling <br /> • Equipment decontamination procedures <br /> • Water level measurement procedures <br /> • Well purging (include a discussion of procedures to follow if three casing volumes <br /> cannot be purged) <br /> • Monitoring and record keeping during water level measurement and well purging <br /> (include copies of record keeping logs to be used) <br /> • Purge water disposal <br /> • Analytical methods and required reporting limits <br /> • Sample containers and preservatives <br /> • Sampling <br /> - General sampling techniques <br /> - Record keeping during sampling (include copies of record keeping logs to <br /> be used) <br /> - QA/QC samples <br /> • Chain of Custody <br /> • Sample handling and transport <br /> SECTION 2 - Monitoring Well Installation Report <br /> The monitoring well installation report must provide the information listed below. In addition, the <br /> report must also clearly identify, describe, and justify any deviations from the approved <br /> workplan. <br /> A. General Information- <br /> Purpose of the well installation project <br /> Brief description of local geologic and hydrogeologic conditions encountered during <br /> installation of the wells <br /> E-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.