My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
3900
>
2900 - Site Mitigation Program
>
PR0505422
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 1:37:45 PM
Creation date
11/15/2019 1:33:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0505422
PE
2965
FACILITY_ID
FA0006902
FACILITY_NAME
TRACY WASTEWATER TX PLNT
STREET_NUMBER
3900
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3900 HOLLY DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRACY WWTP—TASK M TOS MDWORDID WELL INSTALLATION WOW" <br /> Waste Handling Procedures <br /> Liquid and soil waste generated by the well installation will not require special handling. <br /> No existing soil or water quality sampling data indicate that conditions have been adversely <br /> impacted. Soil waste created during drilling will be retained on the W WTP property. <br /> Cuttings at Sites A and B will be spread on the ground near the boreholes. Cuttings from <br /> Site C will be moved to inside the fenced area and placed in a location to be determined by <br /> the City. Liquid waste,if any,will be treated at the plant. <br /> Health and Safety Procedures <br /> Fieldwork will be conducted in accordance with the Health and Safety Plan for Field <br /> Activities prepared for the site by CH2M HILL.CH2M HILL personnel and subcontractors <br /> performing fieldwork specified in this Work Plan will be required to read this health and <br /> safety plan prior to performing fieldwork on site. Onsite personnel and visitors will be <br /> briefed each day regarding Health and Safety procedures and required to sign the Health <br /> and Safety log. In addition,visitors to the site will be asked to read the Health and Safety <br /> Plan prior to being in the immediate vicinity of the site activities. <br /> Monitoring Well Design <br /> Figure 9 shows the schematic of the planned well construction. For consistency,the wells <br /> will be constructed in a similar manner to the existing holding pond monitoring wells. Final <br /> decisions regarding the length and interval of the well screen will be made by the onsite <br /> Professional Geologist. <br /> Monitoring wells will be designed and completed in accordance with ASTM standards <br /> D6286. The wells will be constructed as follows: <br /> • Well riser and screen will be 4-inch,flush-threaded schedule 40 PVC. <br /> • Well screen will have 0.020-inch machine slotted openings. It will be 20 feet in length <br /> and installed at the bottom of the well. <br /> • The end cap will be flush-threaded. <br /> • Filter pack will be No.3 Lonestar Monterey Sand,or an equivalent 8 x 20 sand. Filter <br /> pack will be emplaced as the augers are withdrawn from the borehole. Filter pack will <br /> be surged after emplacement and additional sand added so that the top of the filter pack <br /> extends at least 3 feet above the upper well screen interval. <br /> • One foot of fine-grained sand(No.60 or similar)will be added to the top of the filter <br /> back to reduce the potential for migration of the bentonite seal into the filter pack. <br /> • Bentonite pellets will be added to a depth of 2 feet If the bentonite pellets are above the <br /> water table, potable water will be added to the pellets for hydration. <br /> • Cement grout will be emplaced from the top of the bentonite seal to 1 foot below grade. <br /> The grout will consist of Type I or It Portland Cement blended with 5 percent powdered <br /> bentonite. <br /> Oct"31,1W7 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.