My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
3900
>
2900 - Site Mitigation Program
>
PR0505422
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 1:37:45 PM
Creation date
11/15/2019 1:33:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0505422
PE
2965
FACILITY_ID
FA0006902
FACILITY_NAME
TRACY WASTEWATER TX PLNT
STREET_NUMBER
3900
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3900 HOLLY DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRACY W WTP-TASK 14 TOS MONTORING WELL WSTALLATION WORK RAN <br /> Drilling Details and Field Operations <br /> This section summarizes key field methods and procedures that will be used during field <br /> work at the site <br /> Permitting and Utility Clearance <br /> Well-drilling permits will be obtained by the driller from the San Joaquin County <br /> Environmental Health Department prior to commencing field activities. Underground <br /> utilities will be located by notifying underground service alert(USA)at 1-800-227-2600 for <br /> offsite utility clearance,as well as the City for onsite utility information after the well sites <br /> are marked with flagging and white paint. If there is question about the location of <br /> underground utilities,CH2M HILL will contract with a private utility locating service to <br /> clear sample location in areas where utilities are known to be present. <br /> Overhead power lines are located along the fence line near Sites A and B. The required <br /> minimum separation of 10 feet between the power lines and any part of the drilling <br /> equipment will be maintained at all times. This includes both during drilling and moving <br /> the rig. The rig will not be moved when the mast is raised. <br /> Site Security and On-Site Supervision <br /> No additional security or access issues are expected to be required. Drilling and installing <br /> three shallow monitoring wells is expected to require less than 2 days of field effort. Site A <br /> -the only drilling location outside the secured plant facility-is planned to be installed first. <br /> Sites B and C will be installed inside the secured plant facility. <br /> Borehole drilling and monitoring well installation will be directed by a California <br /> Professional Geologist. <br /> Borehole Drilling and Sample Logging <br /> Boreholes for the investigation will be drilled using the hollow-stem auger(HSA)technique. <br /> Borings will be approximately 35 feet below grade. Native soils will be logged at 5-foot <br /> intervals in accordance with the Unified Soil Classification System. Borehole drilling, <br /> borehole advancement,and soil logging will be performed by the onsite professional <br /> geologist in accordance with ASTM D2488. <br /> The outer diameter of the HSAs-and therefore the borehole-will be 11 inches in diameter. <br /> Drilling and monitoring well installation will be conducted by a licensed and bonded <br /> driller. Sample descriptions will be recorded directly onto CH2M HILLs standard boring <br /> log form. Site and drilling information will be maintained on the daily field activities form. <br /> Decontamination Procedures <br /> Drilling equipment(rig,auger,rods,etc) will be steam-cleaned prior to arriving at the Tracy <br /> W WTP. After arrival it will be cleaned again on the W WTP property to confirm that drilling <br /> equipment is clean prior to initiating drilling activities. Downhole equipment will be steam- <br /> cleaned between boreholes and after drilling activities are completed. <br /> 00*w 31,2007 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.