Laserfiche WebLink
At' <br />PA 1900126 <br />WARE MALCOMB <br />ARCHITECTURE I PLANNING INTERIORS <br />BRANDING CIVIL ENGINEERING <br />Memorandum <br />Date: 05.28.2019 Project Name: Airpark 599 <br />To: San Joaquin County Project No.: SNR19-0043-00 <br />Community Development Department <br />Attn: Zoey Merrill, Interim Director <br />From: Ware Malcomb <br />Attn: Jim Terry <br />Subject: Statement of Conformity <br />Copies To: Catellus Stockton, LLC. <br />Attn: Sean Whiskeman <br />To Whom It May Concern, <br />We have prepared the attached submittal for a three (3) building phase of the Airpark 599/Airport East Area within the Stockton <br />Metropolitan Airport Special Purpose Plan. This phase represents approximately 911,000sf of industrial warehouse and <br />distribution space on roughly fifty-five (55) acres of land designed to meet the current demands of similar users within <br />Stockton and the larger Central Valley, Airpark 599 is well served to attract quality industrial warehouse and distribution <br />tenants based on its excellent location, excellent access to transportation corridors and quality park attributes. <br />The Stockton Metropolitan Special Purpose Plan outlines several key goals and objectives including, but not limited to the following: <br />Develop a phased, flexible business park for office/R&D/flex uses and Industrial/Warehouse & Distribution uses in the <br />Airport East Area....; <br />Provide development opportunities to create a sustainable business employment district that enhances the long-term <br />economic vitality of the Stockton Metropolitan Airport and South Stockton; <br />Reinforce the agrarian character of South Stockton in the landscape and open space framework; <br />Provide flexibility for development to occur in a logical and economically beneficial manner over time; <br />Provide for a comprehensive phased infrastructure and site drainage system. <br />This phase meets these key goals and objectives as well as the following key standards and guidelines: <br />Site Planning: Our buildings are oriented so that offices will front the street and create positive streetscapes along Qantas Lane, <br />including pedestrian paths connecting office spaces to the right of way and pedestrian entry courts adjacent to future office <br />entries. Our building footprints vary in size which allows for a variety of uses and prospective tenants. The buildings are also <br />set back from the street and each other in excess of the business park setback standards, and oriented so that frontage is <br />parallel or near parallel to the frontage street. The design of the buildings is intended to create a campus feel per the SPP <br />recommendation, and varying sizes and setbacks within the same design concept reinforce this concept. <br />Amenities: Our project shall have landscaping along frontage per SPP guidelines and standards. In addition, lighting shall be <br />provided to maintain levels of illumination per county and local standards. Entries to future offices shall have an enhanced <br />4683 Chabot Dr #300, Pleasanton, CA 94588 P 925.244.9620 F 925.244.9621 5.28.2019 PAGE 1