10/22/03 A soil vapor extraction test was conducted on wells MW-1 and VW-1. See GZA's <br /> May 20, 2004 report noted above. <br /> 11/05/03 The Groundwater Extraction (GWE) system began operation. The extracted <br /> groundwater was treated and discharged to ground surface pursuant to WDR <br /> General Order No. R5-2003-0044-12. See GZA's Fourth Quarter 2003 Groundwater <br /> Monitoring Report dated May 28, 2004, available on Questy's. <br /> 06/30/04 Two groundwater monitoring wells, MW-15 and MW-16 were installed onsite. See <br /> GZA's April — June 2004 Groundwater Monitoring and Installation of Monitoring <br /> Wells Report dated August 18, 2004, available on Questy's. <br /> 07/20/04 Groundwater extraction well EW-2 was installed this date. See GZA's July- <br /> September 2004 Groundwater Monitoring Report dated November 5, 2004, <br /> available on Questy's. <br /> 11/24/04 Groundwater extraction well EW-2 was placed in operation with the groundwater <br /> extraction system. See GZA's October - December 2004 Groundwater Monitoring <br /> Report dated February 16, 2005, available on Questy's. <br /> 01/18/05 Vapor extraction well VW-2 was installed this date. See GZA's January — March <br /> 2005 Groundwater Monitoring Report dated May 2, 2005, available on Questy's. <br /> 02/18/05 Groundwater monitoring well MW-2 was destroyed under permit and inspection to <br /> allow for road construction in the area. See GZA's May 2, 2005 report noted above. <br /> 08/08/05 The Soil Vapor Extraction (SVE) system began operation this date. The system <br /> utilized SVE wells VW-1 and VW-2, dual phase extraction well EW-1 (formerly <br /> MW-1) and groundwater monitoring wells MW-3 and MW-4 See GZA's Quarterly <br /> Monitoring Report July through September 2005 dated November 22, 2005, <br /> available on GeoTracker. <br /> 03/30/07 The SVE system was shut down this date. At the time of shut down it was drawing <br /> exclusively from well MW-4, intermittently in dual-phase mode, to keep emissions <br /> below one pound hydrocarbons per day. <br /> 10/11/07 Fieldwork began this date on the installation of three groundwater monitoring wells, <br /> MW-17B, MW-18C, and MW-19D. See GZA's Monitoring Well Installation and Soil <br /> Investigation Report—Fall 2007 dated November 28, 2007, available on GeoTracker. <br /> 11/02/07 Two confirmation soil borings, CB-1 and CB-2 were advanced beginning this date. <br /> See GZA's November 29, 2007 report noted above. <br /> 12/04/07 Groundwater extraction well EW-3 was installed this date. See GZA's Quarterly <br /> Groundwater Monitoring and Treatment System Operational Report October <br /> through December 2007 dated February 6, 2008, available on GeoTracker. <br /> 01/21/08 Soil vapor extraction rebound test was conducted this date. See GZA's Quarterly <br /> Groundwater Monitoring, Groundwater Treatment System Operation and <br /> Effectiveness, Soil Vapor Extraction System Rebound Test and Additional Site Work <br /> Report-January through March 2008, dated April 7, 2008, available on GeoTracker. <br /> Pulsed operation of the system continued. <br />