Laserfiche WebLink
NF_4R DOCUMENTATION <br /> 1.0 Site History and Current Site Conditions <br /> The Speedy Food Mart (Site) is located at 8200 N. Highway 99, the northeast corner of the <br /> intersection of Frontage Road and Foppiano Lane, in Stockton, California (A-PN 08531010). A <br /> vicinity map is included as Figure 1. The 2.18 acre parcel is bounded by a vacant field to the east, <br /> Foppiano Lane to the south, Frontage Road and Highway 99 to the west, and residences to the north. <br /> The area is designated as being undeveloped urban and is currently used primarily for agricultural <br /> purposes with the closest residential tract located approximately 300 feet north of the former <br /> underground storage tanks(USTs). <br /> The property formerly operated as a gasoline station with tluee 8,000-gallon gasoline USTs and <br /> associated fuel dispensers which were removed in 1998. A Mini Mart and panting lot currently sit <br /> on southwestern most 0.36 acres of the Site and fuel is no longer dispensed. The remaining 1.82 <br /> acres is vacant undeveloped land. <br /> 1.1 Chronology <br /> On January 28, 1998, three 8,000-gallon USTs, dispenser pumps, and piping used to store and <br /> convey gasoline were removed from the Site. Contamination was noted during removal of the <br /> USTs and soil samples were collected from beneath the removed USTs and the pump island. The <br /> soil samples revealed the presence of petroleum hydrocarbon constituents. The excavation measured <br /> approximately 25' x 30' x 15' deep. As an interim abatement measure, the excavation was lined <br /> with black plastic, and the soil was returned to the hole. Details are discussed Ground Zero <br /> Analysis, Inc.'s (Ground Zero) Speedy Mart Groundwater and Soil Investigation dated February 24, <br /> 1999. <br /> On September 23, 1998, William J. Hunter, RG, of Wm J. Hunter & Associates (Hunter & <br /> Associates) supervised the excavated p�oxi_m�ttely 166 cubic_ 11-dS (Vd3 of iM13 ►rtPft !;n;r by r;m <br /> Thorpe Oil, Inc (Thorpe). Additional subsurface investigation and assessment work was performed <br /> by Ground Zero in November 1998. The investigation consisted of drilling two pilot borings (CPT] <br /> and CPT2) using a cone penetrometer testing drill rig to identify subsurface lithology. Then soil <br /> samples were collected from three borings (SBI, SB2, and SB3) at significant changes in lithology, <br /> based upon the CPT data collected from the pilot borings. Details are discussed in Ground Zero's <br /> Speedy Mart Groundivater and Soil Investigation date February 24, 1999. <br /> On October 4, 1999 through October 8, 1999 Growid Zero persorulel supervised Spectrum <br /> Exploration Inc. (Spectrum) during the advancement of two borings (SB4 and SB5) as well as the <br /> installation of four groundwater monitoring wells (MW 1 through MW4). The newly installed <br /> groundwater monitoring wells developed between October 12 and 13, 1999. On February 28, 2000, <br /> Ground Zero personnel supervised Welenco in conducting a video survey of the water supply well <br /> to determine well construction details and evaluate the integrity of the well casing. Details are <br /> discussed in Ground Zero's Groundwater Monitoring Well Installation Report dated April 28, 2000. <br /> G:ZROUNDZEIl"ULEUERG\Rcpons\OdicMppeudix A Site Closure Rcpomdoc <br /> I <br />