Laserfiche WebLink
� <br /> CHRONOLOGY <br /> Speedy Foods <br /> 8200 North Highway 99 <br /> Stockton, CA 95212 <br /> 11/21/05 Piping repair work completed at site; soil Cont@[niOaUOO noted at time of work. <br /> 01/10/96 Unauthorized Release Report #98'008 and Notification of Hazardous VVauto <br /> Discharge#9O-O0Ofiled this date. <br /> 03/35/97 Notice of Responsibility sent to responsible party Tuleburg Warehouse. <br /> 09/04/87 Site accepted to State Water Resources Control Board (SVVRCB) Cleanup Fund <br /> (CUF) Claim #1258O. priority class C. <br /> 11/13/97 Letter ofCommitment (L[)C) issued bothe site bvthe 8VVRCBCUR <br /> 01/28/98 Three 0.000-Qm||on underground storage tanks removed this dote under San <br /> Joaquin County Environmental Health Department (EHD) permit and inspection. <br /> Soil nonnp|ee for laboratory analysis were collected from beneath the banka, the <br /> dispenser and the soil stockpiles. The tank excavation was lined with viequeen <br /> plastic and the etonkp||ao were returned to the pit. Analytical nsou|bo reported <br /> petroleum hydrocarbon contamination in the soil samples. Gee Ground Zero <br /> Analysis' (GZ ) Speedy Foods Groundwater and Soil Investigation Report dated <br /> February 24. 1999. available onC)uestv's. <br /> 03/18/98 Unauthorized Release Report#88-U1Uwas submitted this date. <br /> ' <br /> 09/23/98 Approximately 186 cubic yards of soil were removed from the lined bank pit and <br /> hauled to Forward Landfill in Manteca. Sea (3ZA'a February 24, 1999 report. <br /> 11/09/98 Two cone penatrometorbsst bohngs. CPT-1 and CPT-2, and three soil borings, <br /> 8B'1 through 8B-3were advanced on site. See {SZA'm2/24/88 report noted above. <br /> 10/04/99 Two soil boringa. SB-4 and SB-5, and four groundwater monitoring vveUs. MW-1 <br /> through MW-4 installed on site. See GZA's Groundwater Monitoring Well Installation <br /> Report dated April 28. 2ODO. available onCluostv'a. <br /> 10/16/00 Five groundwater monitoring wells, MW-5 through MW-8 and N1VV-SB. were installed <br /> on site. See GZA's Additional Subsurface Investigation Report dated <br /> February 28. 2OO1. available onQumeh/'o. <br /> 08/06/01 Bailing of free product began this date and continued until the groundwater <br /> extraction system was started. Geo GZA'o Third {}uedmr Groundwater Monitoring <br /> and Sampling Report dated October 12. 2OO1. available on {]uaob/'a. <br /> 02/28/02 A new water supply well for the facility was p|mmad on line. The original onsite well <br /> was impacted with petroleum hydrocarbon contamination and was destroyed. <br /> 10/06/03 Five groundwater monitoring vve||o. MW-10 through yWVV'12. MW-13C and MW-14B, <br /> and one remediation well, VVV-1. were installed onsite. See GZA'sMonitoring N/o0 <br /> Installation Report dated May 2O. 2UO4. available nnOuostv'a. <br />