Laserfiche WebLink
10/22/03 Asoi| vapor extraction test was conducted on wells MW-1 and VW-1. See GZA's <br /> May 2O. 2O04report noted above. <br /> 11/05/03 The Groundwater Extraction (GVVE) system began operation. The extracted <br /> groundwater was treated and 'diachnged to ground surface pursuant to VVDR <br /> General Order No. R5-2003-0044-12. See {3ZA'o Fourth Quarter 2003 Groundwater <br /> Monitoring Report dated May 2O. 2OO4. available onQuaob/'s. <br /> 06/30/04 Two groundwater monitoring xve||s. MW-15 and MVV-16 were installed onsite. See <br /> G2)A's April — June 2004 Groundwater Monitoring and Installation of Monitoring <br /> Wells Report dated August 1G. 20O4. available on (]ueshv'a. <br /> 07/20/04 Groundwater extraction well EW-2 was installed this date. See GZA'o July- <br /> September 2004 Groundwater Monitoring Report dated November 5. 2004. <br /> available on C)uasb/'a. <br /> 11/24/04 Groundwater extraction well EW-2 was placed in opan@Umn with the groundwater <br /> extraction ayohenn. See (3ZA'm October - December 2004 Groundwater Monitoring <br /> Report dated February 18. 2OO5. available on (]uestv's. <br /> 01/18/05 Vapor extraction well VW-2 was installed this date. Seg {SZA'o January — Manch <br /> 20O5Groundwater Monitoring Report dated May 2. 2O05. available onC>ueshv'o. <br /> 02/18/05 GnoundvvotmrrnonitohnQ well K8VV-2 was destroyed under permit and inspection to <br /> allow for road construction in the area. See GZA's May 2, 2005 report noted above. <br /> 08/08/05 The Soil Vapor Extraction (8VE\ system began operation this date. The system <br /> uti|izad SVE wells VW-1 and ' '2, dual phase extraction well EW-1 (formerly <br /> MW-1) and Qnoundvvabernnonibohng vvo||s K�VV-3 and K�VV-4 See (�ZA's Quarterly <br /> 8�)n ` — Report July through September 2005 dated ��overnber22. 2OO5. <br /> /�onnQ ' —' -�� <br /> available on (3eoTracker. <br /> 03/30/07 The GVE evetenn xvao shut down this date. At the time of shut down � moao drawing <br /> exclusively well K8VV-4. intermittently in dual-phase rnode, to keep ern|maiona <br /> below one pound hydrocarbons per day. <br /> 10/11/87 Fieldwork began this date on the installation of three groundwater monitoring vxe||o. <br /> MW-17B. MW-18C, and K8VV-19O. Sea C9ZA'o Monitoring Well Installation and Soil <br /> /nwymbom/kon Report—Fall 2007 dated November 28. 2007. available on GeoTnacker. <br /> 11/02/07 Two confirmation soil borings. CB-1 and CB'2were advanced beginning this date. <br /> See GZASNovember 29, 2DO7report noted above. <br /> 12/04/07 Groundwater extraction well EW-3 was installed this dote. See GZ\'e Quarterly <br /> Groundwater Monitoring and Treatment System Operational Report October <br /> bhnouoh [)ecmxnber2O8atedFebruary6. 2OO8. avei|ob|eonGaoTrooher. <br /> 01/21/08 Soil vapor extraction rebound test was conducted this date. Sam GZA'a Quarterly <br /> Groundwater Monitoring, Groundwater Treatment System Operation and <br /> Effectiveness, Soil yeoUrEX�8CboOSV3��� Rebound Test and/4dOY&on@/8dek�onk <br /> Report-January through <br /> Manch 2008 dated April 7. 2008. available OD G8oT[aCker. <br /> Pulsed operation ofthe system continued. <br />