My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0080932 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PALMQUIST
>
8891
>
2600 - Land Use Program
>
SR0080932 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2019 2:12:35 PM
Creation date
11/18/2019 1:47:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0080932
PE
2602
STREET_NUMBER
8891
Direction
W
STREET_NAME
PALMQUIST
STREET_TYPE
AVE
City
TRACY
Zip
95304
APN
24807024
ENTERED_DATE
7/23/2019 12:00:00 AM
SITE_LOCATION
8891 W PALMQUIST AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
test is the only accepted method for determining the suitability of the soils for a septic <br /> disposal area. Percolation test results are discussed in the following section. <br /> Percolation Test <br /> A shallow percolation test was conducted in the proposed septic disposal area of the <br /> Site. The soil boring discussed above was used for the percolation test hole. <br /> Percolation test procedures conformed to San Joaquin County Environmental Health <br /> Department policy. <br /> Preparation and Presaturation of Percolation Test Holes <br /> After the boring was advanced by hand auger and the soil logged, the test hole was <br /> completed for the percolation testing. Approximately two inches of pea gravel were <br /> placed in the bottom of the open soil boring, followed by a 2.0-inch diameter PVC pipe <br /> with perforations on the bottom. Pea gravel was then used to backfill a few inches of <br /> the annular space. <br /> Live Oak presaturated the percolation test hole approximately 24 hours prior to the <br /> percolation testing. The hole was filled with water to a height of 12 inches above the <br /> bottom of the boring for the presaturation. On the day of testing, the hole was found to <br /> be intact and dry. <br /> Percolation Test Procedure <br /> Live Oak conducted the percolation test for the boring on July 2, 2-_019. Based on the <br /> soil type observed, a four-hour test was selected. Water eve measurements were <br /> taken every 30 minutes during this four-hour period. The last 30 minutes of the test <br /> were observed by Daria Afonskaia, Registered Environmental Health Specialist at the <br /> San Joaquin County Environmental Health Department. <br /> An electronic well sounder with a depth accuracy of 1/100th foot was utilized for the <br /> water level measurements. The water level was measured against a fixed reference <br /> point on the well casing. Measurements were recorded on the data sheet in decimal <br /> feet. When necessary after measuring the water level, the hole was refilled with water <br /> to a level of six inches or more above the bottom of the hole. <br /> Percolation Test Results <br /> The completed percolation test form is included in Appendix 3 of this report. The form <br /> was signed by Ms. Afonskaia and indicates a percolation rate for the hole based on the <br /> final water drop observed. <br /> LOGE 1922 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.