Laserfiche WebLink
i <br /> Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> April 30. <br /> • Limit vegetation clearing within 200 <br /> feet of the banks of the Woodbridge <br /> Irrigation District canal to the <br /> minimum necessary. <br /> • Where feasible,confine movement <br /> of heavy equipment within 200 feet <br /> of the banks of the Woodbridge <br /> Irrigation District canal to existing <br /> farm roads to minimize habitat <br /> disturbance. <br /> • Prior to ground disturbance,all <br /> onsite construction personnel shall <br /> be given instruction regarding the <br /> presence of SJMSCP Covered <br /> Species and the importance of <br /> avoiding impacts to these species <br /> and their habitats(Per Mitigation <br /> Measure 4.6-1 a). <br /> • Install temporary fencing at the edge <br /> of the construction area and the <br /> adjacent Woodbridge Irrigation <br /> District canal southern bank(Per <br /> Mitigation Measure 4.6-1b). <br /> • Restrict working areas,spoils and <br /> equipment storage and other project <br /> activities to areas outside of the <br /> proposed northern buffer area. <br /> • Maintain water quality and limit <br /> construction runoff into the irrigation <br /> ditch through best-management- <br /> practices(Per Mitigation Measure <br /> 4.6-1 e). <br /> • A preconstruction survey for giant <br /> garter snake shall occur prior to <br /> construction activities and within 24 <br /> hours of ground disturbance. <br /> Section 1.0 Introduction 10 August 2022 <br />