My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012627
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
11105
>
2600 - Land Use Program
>
PA-1900240
>
SU0012627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 10:05:37 AM
Creation date
11/19/2019 8:17:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012627
PE
2633
FACILITY_NAME
PA-1900240
STREET_NUMBER
11105
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95242-
APN
05908007, 05908029, 05908030
ENTERED_DATE
11/1/2019 12:00:00 AM
SITE_LOCATION
11105 N HAM LN
RECEIVED_DATE
11/1/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.6-1g: Conduct Preconstruction Surveys Action: Project Biologist San Joaquin County SJCOG <br /> for Nesting Migratory Birds and Raptors. Conduct <br /> The Project Area supports suitable nesting preconstruction <br /> habitat for a variety of special-status birds and bird surveys. <br /> birds protected under the MBTA.To minimize <br /> impacts to protected bird and active nests Timing: <br /> during construction,the following measures Within 14 days Initials Initials <br /> are required: prior to the start of <br /> • Conduct a pre-construction nesting construction during <br /> raptor and bird survey of all suitable nesting season. Date Date <br /> habitat on the Project site within 14 <br /> days of the commencement ground <br /> disturbance(e.g.,tree/vegetation <br /> removal,mass grading)during the <br /> nesting season(February 1— <br /> August 31).Where accessible, <br /> surveys shall also be conducted <br /> within 100 feet of the Project site. <br /> • If active nests are found,a no- <br /> disturbance buffer around the nest <br /> shall be established.Per the <br /> SJMSCP,a 100-foot buffer shall be <br /> established and maintained during <br /> the nesting season for white-tailed <br /> kite,Cooper's hawk,loggerhead <br /> shrike,yellow-billed magpie,and <br /> other birds protected under the <br /> M BTA. <br /> • The buffer shall be maintained until <br /> the fledglings are capable of flight <br /> and become independent of the <br /> nest,to be determined by a qualified <br /> biologist.Once the young are <br /> independent of the nest,no further <br /> measures are necessary. <br /> In addition to the above,the following <br /> SJMSCP Incidental Take Minimization <br /> Measure shall be implemented should a known <br /> Swainson's hawk nest tree(i.e.,trees that <br /> Section 1.0 Introduction 11 August 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.