Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> 4.6-1 h: Burrowing Owl. Action: Project Biologist CSJCDD CDFW <br /> Prior to site grading/ground disturbance,the Avoid impacts to <br /> project site shall be surveyed for burrowing burrowing owls. <br /> owl. Should it be determined that burrowing <br /> owl are present,the following shall be Timing: <br /> implemented: Prior to site <br /> • During the non-breeding season grading/ground Initials Initials <br /> construction <br /> (September 1 through January 31) <br /> burrowing owls occupying the Date Date <br /> Project site should be evicted from <br /> the Project site by passive <br /> relocation as described in the <br /> CDFW's Staff Report on Burrowing <br /> Owls(CDFG 2012). Passive <br /> relocation is a technique of installing <br /> one-way doors in burrow openings <br /> to temporarily or permanently evict <br /> burrowing owls and prevent burrow <br /> re-occupation(CDFG 2012). <br /> • During the breeding season <br /> (February 1 through August 31) <br /> occupied burrows shall not be <br /> disturbed and shall be provided with <br /> a 75-meter protective buffer until <br /> and unless SJCOG,with <br /> concurrence of the permitting <br /> Agencies,or unless a qualified <br /> biologist approved by the permitting <br /> Agencies,verifies through non- <br /> invasive means that either: 1)the <br /> birds have not begun egg laying,or <br /> 2)juveniles from the occupied <br /> burrows are foraging independently <br /> and are capable of independent <br /> survival.Once the fledglings are <br /> capable of independent survival,the <br /> Section 1.0 Introduction 13 August 2022 <br />