Laserfiche WebLink
Jiiiagle- JM Eagle <br /> `�o�/ <br /> Stockton Plant <br /> Building essentials <br /> forabercertornorrow- <br /> Fire Extinguisher Inspection Page 2 of 3 <br /> i <br /> No. Location Annual Date Comments <br /> 35. ABS Line 1 on wall by tanks 10/23/2007 <br /> 36. ABS Line 1 on wall by table 10/23/2007 <br /> 37. ABS Line 1 door 10/23/2007 <br /> 38. ABS Line 6 table 10/23/2007 <br /> 39. ABS Line 6 between 6-7 conveyor 12/18/2007 <br /> 40. ABS Line 6-7 between electrical panels 12/18/2007 <br /> 41. ABS Line 10 12/18/2007 <br /> 42. ABS @ QC & stop sip 9/19/2007 <br /> 43. ABS Big Door South end of shop/Line 11 4/17/2008 <br /> 44. ABS Time clock 4/11/2008 <br /> 45. Line 11 by silos 10/23/2007 <br /> 46. Line 12 by loader 9/19/2007 <br /> 47. Line 12 between 12 & 13 tables 12/18/2007 <br /> 48. Line 14 between 14 & 15 tables 9/19/2007 <br /> 49. Line 15 by silos 12/18/2007 <br /> 50. Line 16 by desk 4/11/2008 <br /> 51. Line 17 @ extruder 9/19/2007 <br /> 52. Line 18 between 18 & 19 4/11/2008 <br /> 53. Line 20 @ desk 9/19/2007 <br /> 54. B/C Breakroom outside wall 12/18/2007 <br /> 55. Tooling dies 12/18/2007 <br /> 56. Tooling sleeve crib 4/17/2008 <br /> 57. Tooling Plastpro door 9/19/2007 <br /> 58. Tooling area @ Old mixer 12/18/2007 <br /> 59. QC test area by scales/big door 12/18/2007 <br /> 60. QC Test area South wall by saw 12/18/2007 <br /> 61. Line 23 between 23 & 24 tables 9/19/2007 <br /> 62. Line 24 Between 23 & 24 extruder 12/18/2007 <br /> 63. Line 26 Extruder area 1/23/2008 <br /> 64. Line 27 between 27 & 28 bellers 12/18/2007 <br /> 65. Line 28 Extruder area 12/18/2007 <br /> 66. Line 29 between 29 & 30 tanks 12/18/2007 <br /> 67. Line 31 wall by door 10/23/2007 <br /> 68. Perma Loc#7 Extruder area 9/19/2007 <br /> 69. Perma Loc#10 Extruder area 10/23/2007 <br /> 70. Perma Loc behind#10 in doorway 10/23/2007 <br /> 71. Grinder Big Door West side 10/23/2007 <br /> 72.1 Pulverizer Entry Door to the left 10/23/2007 <br />