My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SPERRY
>
1051
>
2200 - Hazardous Waste Program
>
PR0514024
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 2:17:49 PM
Creation date
11/19/2019 2:04:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514024
PE
2220
FACILITY_ID
FA0004231
FACILITY_NAME
J M EAGLE (WS)
STREET_NUMBER
1051
STREET_NAME
SPERRY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17728039
CURRENT_STATUS
01
SITE_LOCATION
1051 SPERRY RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JMiagie JM Eagle <br /> `�_0�1011 <br /> Stockton Plant <br /> Building essenriul <br /> for a better tom...i,,, Fire Extinguisher Inspection Page 3 of 3 <br /> No. Location Annual Date Comments <br /> 73. Pulverizer on wall 4/17/2008 <br /> 74. Grinder office 12/18/2007 <br /> 75. Old Ball Mill 12/18/2007 <br /> 76. Pump House 12/18/2007 <br /> 77. -Propane Tank 10/23/2007 <br /> 78. Water Pit by shed 4/17/2008 <br /> 79. Rail road pumping stations 12/18/2007 <br /> 80. Plastpro South wall 4/11/2008 <br /> 81. Plas ro 2"d column from south wall 1/23/2008 <br /> 82. Plastpro center column 4/11/2008 <br /> 83. Plastpro Back wall by door 1/23/2008 <br /> 84. Plastpro Last column(East) 12/18/2007 <br /> 85. Plastpro Last column(West) 9/19/2007 <br /> 86. Plastpro Office 9/19/2007 <br /> 87. Hydro 12/18/2007 <br /> 88. QA Office 12/18/2007 <br /> 89. Electrical Room—West 4/17/2008 <br /> 90. Electrical Room—East 4/17/2008 <br /> 91. Mixer Top Floor—Wall 10/23/2007 <br /> 92. Mixer Second Floor—Additive Bins 10/23/2007 <br /> 93. Mixer Second Floor—Cool Mixer 11/13/2007 <br /> 94. Mixer—Bottom Floor—South wall- East 4/17/2008 <br /> 95. Mixer—Center beam 10/23/2007 <br /> 96. Mixer—Bottom Floor—South wall -West 10/23/2007 <br /> 97. Mixer—Office 10/23/2007 <br /> 98. Oil Room (West) 4/17/2008 <br /> 99. Oil Room(East) 4/17/2008 <br /> 100 Supervisor Office 4/11/2008 <br /> 101 Guard House 4/17/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.