My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1137
>
2300 - Underground Storage Tank Program
>
PR0530093
>
COMPLIANCE INFO_2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 2:36:09 PM
Creation date
11/19/2019 2:48:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0530093
PE
2351
FACILITY_ID
FA0019793
FACILITY_NAME
CRUISERS MANTECA #29
STREET_NUMBER
1137
Direction
W
STREET_NAME
LATHROP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19724002
CURRENT_STATUS
01
SITE_LOCATION
1137 W LATHROP RD
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification -Page 3 of 3 <br /> Site Address: 1137W. Lathrop Rd. Date of Testing/Servicing: 8/29/18 <br /> F. In - Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ® Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ® Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ® Yes ❑ No* Was accuracy of system product level readings tested? <br /> IR Yes ❑ No* Was accuracy of system water level readings tested? <br /> ® Yes ❑ No* Were all probes reinstalled properly? <br /> ® Yes 1 ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLD's are not installed. <br /> Complete the following checklist: <br /> ® Yes ❑ No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: ® 3 g.p.h.(1.); ❑ 0.1 g.p.h.(2.); ❑ 0.2 g.p.h.(2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> ® Yes ❑ No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> ® N/A <br /> IN Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ® Yes ❑ No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> It Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> ® Yes ❑ No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> N Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.