Laserfiche WebLink
I <br /> EROSION AND SEDIMENT CONTROL NOTES' m <br /> EROSION CONTROL: 1. EROSION CONTROL FACILITIES AND MEASURES ARE TO BE <br /> SEE EROSION, SEDIMENT AND DUST CONTROL NOTES AND DETAILS INSTALLED AND OPERABLE AT ALL TIMES DURING CONSTRUCTION. <br /> ON FOLLOWING SHEET. 2. CHANGES TO THE EROSION CONTROL MEASURES INDICATED ON <br /> CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE. THESE PLANS AND DESCRIBED HEREIN TO ACCOMMODATE FIELD <br /> EC-1 RELOCATE AS NEEDED. CONDITIONS MAY BE MADE ONLY WITH THE PRIOR APPROVAL OF, OR <br /> AT THE DIRECTION OF THE STATE REPRESENTATIVE. <br /> CONSTRUCT CONCRETE WASH-OUT AREA WITH STRAW <br /> 3. EARTHEN BERMS AND STRAW BALE DIKES E NT OFF-FLOW <br /> F -F <br /> BALES OR EARTH ORES AND LINE WITH - MIL. FABRIC BARRIER SHALL BE CONSTRUCTED H PREVENT OFF DIKES <br /> POLYETHYLENE OR RENT CONCRETE WASH-OUT BIN. O <br /> �•i�i RELOCATE AS NEEDED. OR SILTATION FROM THE PROJECT SITE. THE BERMS AND DIKES F <br /> SHALL BE MAINTAINED IN PLACE UNTIL THE CONCLUSION OF THE d <br /> SITE PAVING. <br /> INSTALL FIBER ROLLS ALONG FRONTAGES, ALONG U <br /> LIMIT OF " STREETS, OFF BACK OF WALK AND PROPERTY LINES N <br /> 4. ALL PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL w <br /> IMPROVEMENTS \ EC-3 WHERE CROSS-DRAINAGE IS POSSIBLE. AND DEBRIS THE SITE SHALL BE MAINTAINED SO AS TO PREVENT <br /> ! SEDIMENT- LADEN RUNOFF FROM ENTERING THE STORM DRAINAGE <br /> \ INSTALL FIBER ROLLS OR GRAVEL BAGS AROUND AND <br /> -- • • , �..,..,,. , , �,�.�,;�,� i r�nF� • ® tea ® �_��� ® _ _ _ _ _ • _ _ _ _ • EC-4 FlLTERBAGSWITHIN DROP INLETS AND MANHOLES <br /> DURING CONSTRUCTION. SYSTEM OR ADJACENT PROPERTIES. <br /> 5. ALL EROSION CONTROL FACILITIES SHALL BE INSPECTED BY <br /> - - - . THE CONTRACTOR AND REPAIRED AS REQUIRED AT THE CONCLUSION •' <br /> OF EACH WORKING DAY DURING THE RAINY SEASON THE <br /> �- - - .r • CONTRACTOR SHALL INSPECT THE EROSION CONTROL FACILITIES AND <br /> *I �� N89'44'04'W 186.00' MAKE NECESSARY REPAIRS THERETO PRIOR TO ANTICIPATED STORMS ' !' <br /> AND SHALL PERIODICALLY INSPECT THE SITE AT REASONABLE <br /> 1+ FUTURE INTERVALS DURING STORMS OF EXTENDED DURATION REPAIRS TO <br /> BUILDING DAMAGED FACILITIES SHALL BE REPAIRED IMMEDIATELY, <br /> rn FF=29.50' <br /> ' ^ 6. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR <br /> ....... ' INSTALLATION AND MAINTENANCE OF THE EROSION CONTROL <br /> FACILITIES AND SHALL CONDUCT PERIODIC INSPECTION OF THE O v ' <br /> I WPROJECT SITE DURING STORMS OF PROLONGED DURATION AND/OR <br /> .Iy' • HEAVY INTENSITY TO ASSURE THAT THEY FUNCTION IN THE MANNER <br /> DESCRIBED HEREIN <br /> '• I �'•�a e O STREET LAREAS S UPON LSTARTINGBOPER OPERATIONS ANDRIS SHALL BE ATTVTHE ED FEND OF <br /> ROM E <br /> CVS - P ; " . , t Z • EACH WORKDAY OR AS NECESSARY. <br /> IMPROVEMENT <br /> LIMITS _ a B. THE CONTRACTOR SHALL INSTALL THE STABILIZED A <br /> Q CONSTRUCTION ENTRANCE PRIOR TO COMMENCEMENT OF GRADING. <br /> \ • LOCATION OF THE ENTRANCE MAY BE ADJUSTED BY THE EER <br /> "-' --- - CONTRACTOR TO FACILITATE GRADING OPERATIONS. ALL <br /> CONSTRUCTION TRAFFIC ENTERING THE PAVED ROAD MUST CROSS <br /> e * 589'44'04'E' "' THE STABILIZED CONSTRUCTION ENTRANCE. <br /> 4.16' <br /> N89'44 04'W 124.00' 7 <br /> e <br /> - - - - 9. AS STORM DRAIN IMPROVEMENTS ARE CONSTRUCTED, ALL <br /> a ® EC-4 EC-4 t • _ _ _ - STRUCTURES AND iNLEf PIPES SHALL BE PROTECTED FROM INFLOWS <br /> OR SILT BY PROVIDING FILTER BAGS IN CATCH BASINS. <br /> 12 SD ` i y 10. ADJACENT PROPERTIES SHALL BE PROTECTED FROM STORM VS�5 <br /> -;Y :>- 1gg8 a • WATERS, MUD, SILT ETC. ON A DAILY BASIS. <br /> ii DUST CONTROL SHALL BE MAINTAINED AT ALL TIMES DURING <br /> !R a CONSTRUCTION AND UNTIL FINAL COMPLETION. THE CONTRACTORS �A <br /> ( • WHEN HE OR HIS SUBCONTRACTOR ARE OPERATING EQUIPMENT ON- <br /> '4 I SITE, SHALL PREVENT THE FORMATION OF ANY AIRBORNE NUISANCE rr+ <br /> BY WATERING AND/OR TREATING THE SITE OF THE WORK IN SUCH A <br /> EC ¢ d C r Y 'i}! MANNER THAT WILL CONFINE DUST PARTICLES TO THE IMMEDIATE <br /> SURFACE OF THE WORK. ADDITIONAL WATERING SHALL BE PROVIDED <br /> ON DRY OR WINDY DAYS. THE CONTRACTOR WILL BE RESPONSIBLE <br /> FOR ANY DAMAGE CAUSED BY DUST FROM HIS OWN ACTIVITIES OR <br /> HIS SUBCONTRACTORS ACTIVITIES IN PERFORMING THE WORK UNDER <br /> CONC THIS CONTRACT AND SHALL BE RESPONSIBLE FOR ANY CITATIONS, zo <br /> FINES, OR CHARGES RESULTING FROM DUST NUISANCE. DUST p <br /> r a (TYP.) 6>... . , <br /> CONTROL WILL DE DONE ON A DAILY BASIS. � < U) <br /> I00 .A e ' 0) <br /> \ 3N < '• �•' 12 MAINTENANCE So OO Q <br /> A. THE OI CCTOMEASURES HA <br /> e PROPOSED INSPECTEDEVERYDAY ANDAFTER EACH STORM. BITFENCES, <br /> MCDONALDS BERMS AND SWALES ARE TO BE INSPECTED AFTER EACH <br /> _ <br /> STORM AND a a U <br /> p RESTAURANTS - ' 1 REPAIRS MADE AS NEEDED. SANDBAGS PLACED AROUND THE CURB p IW <br /> I� GAS STATION y LIMIT OF INLETS SHALL BE INSPECTED AND REPLACED IF DAMAGED. C. Q -t <br /> v FF=29.50' t IMPROVEMENTS SEDIMENT SHALL BE REMOVED AND SEDIMENT TRAPS RESTORED TO `� U <br /> O ° PAD=28.66' < I ORIGINAL DIMENSIONS WHEN SEDIMENT HAS ACCUMULATED TO WITHIN ` " I <br /> O x A FOOT OF OUTLET ELEVATION. D. SEDIMENT REMOVED FROM TRAPS <br /> uY ,� .•. '-•` ." SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER R v J <br /> t 00 FUTURE THAT WILL NOT ERODE. E. SEEDED AREAS WILL BE REPAIRED, w <br /> RESEEDED AND MULCHED AS SOON AS POSSIBLE AFTER DAMAGED. ` a 3 <br /> PRIMESHINE ¢ o <br /> CONC N FF=29.50' 13. CONTRACTOR SHALL IMPLEMENT HOUSEKEEPING PRACTICES AS �' w O <br /> N _:._ TANK FOLLOWS: g _ <br /> SiA13• Lel ' _._ A S w o O <br /> '-" OLID WASTE MANAGEMENT: PROVIDE DESIGNATED WASTELLJ <br /> EC-3 .0 a; COLLECTION AREAS AND CONTAINERS. ARRANGE FOR REGULAR Q aLd <br /> ` '_ • _ REMOVAL AND DISPOSAL. CLEAR SITE OF TRASH INCLUDING ORGANIC z a Q <br /> DEBRIS, PACKAGING MATERIALS, SCRAP OR SURPLUS BUILDING F w <br /> O MATERIALS AND DOMESTIC WASTE DAILY. (/1 <br /> .. LLI <br /> TANK rn O _EC-3 B. MATERIAL DELIVERY AND STORAGE: PROVIDE A DESIGNATED o m -41 " <br /> VENT N Z '\ MATERIAL STORAGE AREA WITH SECONDARY CONTAINMENT SUCH AS w ~o N Q <br /> GERMING. STORE MATERIAL ON PALLETS AND PROVIDE COVERING z U O <br /> FOR SOLUBLE MATERIALS. RELOCATE STORAGE AREA INTO BUILDING <br /> I ,? SHELL WHEN POSSIBLE. INSPECT AREA WEEKLY. z < U <br /> C. CONCRETE WASTE: PROVIDE A MINIMUM 10 MIL PLASTIC LINER IN m ti Q a .a°A <br /> < • ® """'' A DESIGNATED AREA FOR A TEMPORARY PIT TO BE USED FOR Z o O_ O,A <br /> ii i1. 'GG CONCRETE TRUCK WASH-OUT. DISPOSE OF HARDENED CONCRETE a ' <br /> x OFFSITE. AT NO TIME SHALL A CONCRETE TRUCK DUMP ITS WASTE a '" 0) <br /> T, AND CLEAN ITS TRUCK INTO THE CITY STORM DRAINS VIA CURB AND .� w m N <br /> r . r• GUTTER. INSPECT DAILY TO CONTROL RUNOFF, AND WEEKLY FOR \�'; <br /> EC-4 <br /> �. • • REMOVAL OF HARDENED CONCRETE. <br /> D. PAINT AND PAINTING SUPPLIES: PROVIDE INSTRUCTION TO ` `•;. "" <br /> EMPLOYEES AND SUBCONTRACTORS REGARDING REDUCTION OF <br /> GRAPHIC SCALE MIT OF I ' POLLUTANTS INCLUDING MATERIAL STORAGE, USE, AND CLEAN UP. < <br /> MCDONALO'S-- EC-2 „ �� - INSPECT SITE WEEKLY FOR EVIDENCE OF IMPROPER DISPOSAL. <br /> 20 0 10 20 y0 IMPROVEMENTS • :. .�• E. VEHICLE FUELING, MAINTENANCE AND CLEANING PROVIDE A <br /> • A. DESIGNATED FUELING AREA WITH SECONDARY CONTAINMENT SUCH AS <br /> O� BERMING. DO NOT ALLOW MOBILE FUELING OF EQUIPMENT. PROVIDE <br /> EQUIPMENT WITH DRIP PANS. RESTRICT ONSITE MAINTENANCE AND 0 <br /> ` <br /> 1N DEETCLEANING OF EQUIPMENT TO A MINIMUM. INSPECT AREA WEEKLY. t, <br /> ( ) -' . <br /> I inch = 20 4ft. • ! . 0 Q <br /> Z h <br /> 0_' M <br /> .. BENCHMARKn _jw <br /> ,\0.66' I_ — _ CITY OF MANTECA BRASS DISK N0. 4 SET IN TOP OF O_' U Z_ � CV � <br /> -- 'Y - 589'44'04"E 181 .84' A _ r N = Z ,� <br /> -�_- M M F• FMfM:� M M — ' ' 125.75' CURB AT THE SOUTH RETURN OF THE SOUTHWEST m <br /> — — — CORNER OF LATHROP ROAD AND UNION ROAD. D_ CI w <br /> 589'44'04"E EC-3 488.06' R2 \ ELEVATION = 28.65 FEET (CIN DATUM) ¢ x z 0 < q A <br /> O <br /> - _ . �._. <br /> -- c <br /> NJ N <br /> .......... _ Z o <br /> . OURADA ENGINEERING- n Q O� 3111 SUNSET BLVD., SUITE L - <br /> r <br /> N01°7 i ROCKLIN, CALIFORNIA95877 N a rya <br /> - .. . .. PHONES (916) 62412 FAX (916) 624-1232 <br /> - - - D_ <br /> JV _ -„ - -., - -30. SURVEY INFORMATION OURADA ENGINEERING 5/02/2008 <br /> UZ O <br /> a <br /> \V� <br /> 689 65'(MON TO MON) <br /> DRAWING, MC7414GR.DWG LAYOUT, EROSION <br /> ~ JOB NO.. MC-1414 REVISED BY, ASM 5 <br /> LA THROP ROAD (60 'RIW) <br /> j <br /> . . : EROSION CONTROLFLAN <br /> DATE : 06/25/200q <br />