Laserfiche WebLink
until a discharge sample can confirm that the contaminants of concern are below <br /> ~ reporting limits. T. he-initial discharge•sample will be analyzed on an expedited <br /> turnaround for the contaminants of concern. <br /> '5) After the discharge permit has been approved, water extraction will resume at the <br /> established rate arrived at in step 93. Water samples will be collected at <br /> approximately 2-3;000-gallom intervals as pumping continues: They will be ' <br /> analyzed on a standard-turnaround for.TPH as gasoline and BTEX and the results { <br /> will be graphed: Pumping will continue for approximately'3 weeks or until a <br /> `discernable concentration decline curve has been established. - <br /> 3:0 SCHEDULE <br /> I he�iiritai to est' lih' -p�Yrrpin'grate anti=o btairrthe-results of-a-dischar-ge sample <br /> (items#1-4) can be performed within'one month of this work plan approval. After a <br /> discharge permit is issued, item 45 could be completed witlun-a month and a report <br /> . <br /> completed within a month thereafter. <br /> 1 <br /> / I <br />