My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
800
>
2900 - Site Mitigation Program
>
PR0539293
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 3:00:05 PM
Creation date
11/20/2019 2:56:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0539293
PE
2957
FACILITY_ID
FA0022465
FACILITY_NAME
VALLEY MOTORS
STREET_NUMBER
800
Direction
E
STREET_NAME
MAIN
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
800 E MAIN
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
until a discharge sample can confirm that the contaminants of concern are below <br /> ~ reporting limits. T. he-initial discharge•sample will be analyzed on an expedited <br /> turnaround for the contaminants of concern. <br /> '5) After the discharge permit has been approved, water extraction will resume at the <br /> established rate arrived at in step 93. Water samples will be collected at <br /> approximately 2-3;000-gallom intervals as pumping continues: They will be ' <br /> analyzed on a standard-turnaround for.TPH as gasoline and BTEX and the results { <br /> will be graphed: Pumping will continue for approximately'3 weeks or until a <br /> `discernable concentration decline curve has been established. - <br /> 3:0 SCHEDULE <br /> I he�iiritai to est' lih' -p�Yrrpin'grate anti=o btairrthe-results of-a-dischar-ge sample <br /> (items#1-4) can be performed within'one month of this work plan approval. After a <br /> discharge permit is issued, item 45 could be completed witlun-a month and a report <br /> . <br /> completed within a month thereafter. <br /> 1 <br /> / I <br />
The URL can be used to link to this page
Your browser does not support the video tag.