My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
800
>
2900 - Site Mitigation Program
>
PR0539293
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 3:04:24 PM
Creation date
11/20/2019 3:01:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0539293
PE
2957
FACILITY_ID
FA0022465
FACILITY_NAME
VALLEY MOTORS
STREET_NUMBER
800
Direction
E
STREET_NAME
MAIN
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
800 E MAIN
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 8. Collect an in#Iuent'water sample at the end of the test and analyze for TPHg and <br /> BTEX;. <br /> 9. Filter extracted water through.four(4)1.carbon drums that are.presently on site to <br /> prepare the water for disposal; - <br /> 3IJP10. Collect a water sample from the holding tank after adequate filtering has occurred <br /> and analyze for constituents to meet MUD disposal,requirements; <br /> 1.Dispose of the:treated water into the sanitary sewer; <br /> 'LJ-12. Analyze test'data and prepare a report of the results, including recommendations <br /> regarding the feasibility of the proposed method. <br /> We estimate that approximately three weeks would be needed.to.complete steps"1 <br /> through 3. Steps 4 through 8 would'require approximately three weeks. Steps 9 through <br /> 11. would require approximately three weeks.:Step-12 would require approximately one k6 <br /> month. The total estimated time for the investigation would be about 3 months. , — ' <br /> 2- <br /> Should you have questions regarding the scope of work or would,like to discuss thiswork <br /> plan further,please contact me-at 530-677-3055. <br /> Sincerely, F <br /> } <br /> Clyde L. IIebbron <br /> r Semor:.Project Geologist <br /> Enclosures <br /> F <br /> Cc: Cindy O'Neill,Valley.Motors . . <br /> y <br /> I <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.