Laserfiche WebLink
r <br /> 8. Collect an in#Iuent'water sample at the end of the test and analyze for TPHg and <br /> BTEX;. <br /> 9. Filter extracted water through.four(4)1.carbon drums that are.presently on site to <br /> prepare the water for disposal; - <br /> 3IJP10. Collect a water sample from the holding tank after adequate filtering has occurred <br /> and analyze for constituents to meet MUD disposal,requirements; <br /> 1.Dispose of the:treated water into the sanitary sewer; <br /> 'LJ-12. Analyze test'data and prepare a report of the results, including recommendations <br /> regarding the feasibility of the proposed method. <br /> We estimate that approximately three weeks would be needed.to.complete steps"1 <br /> through 3. Steps 4 through 8 would'require approximately three weeks. Steps 9 through <br /> 11. would require approximately three weeks.:Step-12 would require approximately one k6 <br /> month. The total estimated time for the investigation would be about 3 months. , — ' <br /> 2- <br /> Should you have questions regarding the scope of work or would,like to discuss thiswork <br /> plan further,please contact me-at 530-677-3055. <br /> Sincerely, F <br /> } <br /> Clyde L. IIebbron <br /> r Semor:.Project Geologist <br /> Enclosures <br /> F <br /> Cc: Cindy O'Neill,Valley.Motors . . <br /> y <br /> I <br /> f <br />