Laserfiche WebLink
the water depth and plume extent aie stable at the present time, and concentrations have been <br /> ifairly constant in most wells <br /> The so,] vapor extraction system is on track to be operational by March 2005 Until the system <br /> has been in operation for at least one month it is not possible to give a reliable estimate of the <br /> duration of the remediation effort but we are hopeful that concentrations can be reduced to <br /> minimal levels within six months <br /> • 4 <br />