Laserfiche WebLink
Sip,-21 -98 05 : 16P <br /> CytoCulture Report on Batch Inoculation And Gallery Installation 4 <br /> • LAGCO Site, Mountain View, CA for Norcal Waste Systems, Inc. <br /> December 19, 1995 <br /> installed The one liter sample was immediately packed on ice for transportation back to the <br /> microbiology laboratory at CytoCuiture in Point Richmond A grab sample of the inoculum <br /> was also collected and preserved on ice for analysis <br /> After the batch inoculation was completed, a second grab sample of groundwater was <br /> collected from the center of the excavation The time between inoculation and this second <br /> grab sample was approximately 1 5 hours <br /> Analysts on all three samples was performed on Friday, December 15, 1995 by CytoCulture's <br /> microbiological laboratory The samples were assayed for ammonia nitrogen, nitrate nitrogen, <br /> Ortho-phosphate, pH and hydrocarbon degrading bacteria utilizing gasolene/diesel/mo or oil as <br /> the sole sources of carbon and energy for bacterial growth The results of these analyses are <br /> enclosed as a laboratory data report <br /> Please contact us at 510-233-0102 if we can answer any questions regarding the inoculation, <br /> gallery installation or microbiological results Thank you <br /> is <br /> Sincerely, <br /> Randall von Wedel, Ph D <br /> Principal & Project Director <br /> CytoCulture International, Inc <br /> Enclosures <br /> December 19, 1995 Microbiological Assay Report for Batch Bioremediation Inoculation <br /> Figure 3 As Built Site Plan for Interim Extraction/Infiltration Pipe Installations and <br /> Future Infiltration Gallery for Proposed in situ Ground Water Bioremediation <br /> i <br />