My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2003 PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
INSTALL_2003 PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2019 8:28:11 AM
Creation date
11/21/2019 8:22:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003 PLANS
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYSTEM INSTALLATION DOCUMENTATION FOR ENVIRONMENTAL MANAGEMENT GROUP. <br /> (PROVIDE DOMMENTS DIRECTLY TO EMCC BEFORE FINAL) <br /> YES No N/A <br /> ❑ ❑ ❑ 1. TLS---350 system installed and located per drawings, <br /> operational and properly configured. <br /> ❑ ❑ ❑ 2. TLS-350 alarms have been tested and configured at their YES No N/A State/ CUPA forms (formally A, B, and C) <br /> proper settings. ❑ ❑ ❑ 1. New Installation projects: Originals to local agency, <br /> ❑ ❑ ❑ 3. All tank manhole covers opened for inspection of tank copies to Environmental Management. <br /> equipment and sump penetrations. <br /> ❑ ❑ ❑ 4. Construction debris has been removed and the parking area ❑ ® ❑ 2. Modification/installation projects: Original to local <br /> cleaned and repaired satisfactorily. agency, copies to Environmental Consultant. <br /> ❑ ❑ 5. Damaged landscaping elements have been replaced or Underground Storage Tank Monitoring and Response Plans: <br /> repaired. ❑ ❑ ® 1. Contact designated agent assigned by SBC Environmental <br /> ❑ ❑ ❑ 6. Standby engine has been successfully tested after new Management to prepare UST Monitoring and Response Plans. <br /> tank cut-over. <br /> ❑ ❑ ❑ 7. Air and water reels located per drawings. (Fleet locations) PST System Certification & Testing Results: <br /> ❑ ❑ ❑ 1. Provide Copies of Tank Integrity Test Results to CUPA & SBC <br /> ❑ ❑ ❑ 8. Seal at the dispenser mount bracket/island interface. Environmental Management. (Not required on installs after July 1, 2003). <br /> ❑ ❑ ❑ 2. Provide copies of completed State Secondary Containment Testing <br /> ❑ ❑ ❑ 9. Emergency shut-off switch located per drawings. (Fleet locations) Report Forms to Cupa & SBC Environmental Management. <br /> ❑ ❑ ❑ 10. Commodity tags installed on fill risers. ❑ ❑ ❑ 3. Provide copies of completed State Monitoring System Certification <br /> forms to CUPA and SBC Environmental Management. <br /> ❑ ❑ ❑ 11. Manholes properly crowned. ❑ ❑ ❑ 4. Place a copy of all reports in HMPPP Binder on site. <br /> ❑ ❑ ❑ 12. Field Inspection Final Acceptance Form signed by all parties. ❑ ❑ ❑ 5. Tank chart (from tank manufacturer) MANDATORY. <br /> 6. Perform Enhanced Leak Detection (ELD). Contact Tracer Reserch Corp. <br /> ❑ ❑ ❑ 13. TLS Records Box and appropriate labels. ® ® ❑ or other SBC Environmental Management approved consultant to perform <br /> testing. <br /> ❑ ❑ ❑ 14. Applied EMCC furnished labels to TLS--350 panel. <br /> Closure Reports: <br /> MANDATORY. ❑ ❑ ❑ 1. Manifests and triptickets, Certificates of Destruction, Compaction reports, <br /> Mount tank chart copy and send original to etc. to Environmental Consultant for inclusion in Closure Report. <br /> EMCC for (amination. ❑ ❑ ❑ <br /> 2. Environmental Consultant to provide and mail copies of the closure report <br /> to SBC Environmental Management. <br /> Sign below to indicate attendance at Final Inspection; Sign again to indicate FINAL ACCEPTANCE of work after Fina/ <br /> Inspection (either in t<eld if no remedial work needed, or offer remediol work concluded. <br /> Send one copy of all documentation to: <br /> ATTENDANCE FINAL ACCEPTANCE SBC Service, Inc. <br /> Facility Engineer Environmental Management <br /> Facility Manager 2600 Camino Ramon, Room 3E000 <br /> San Ramon, CA 94583 <br /> Site Manager <br /> Project Manager <br /> Contractor <br /> Consultant <br /> Environmental Management <br /> LITERATURE (To be placed in a ring binder by contractor, clearly identifying each item. <br /> Outside cover to show job location and date as per sheet P-1 of drawing <br /> set.) One binder to be stored on site and one sent to SBC Environmental <br /> Management. <br /> 8. an f c u er's Warrgaty, Operation Manual Maintenance Data <br /> YES No N/A (list materials received) <br /> E] ❑ ❑ 1. Tanks (Tank chart & drawing by Mfr.) <br /> ❑ ❑ ❑ 2. Sumps LSW1 V 046 <br /> ❑ ❑ ❑ 3. Sensors <br /> ❑ ❑ ❑ 4. Piping REVISIONS / AUTHORIZATIONS <br /> ❑ ❑ ❑ 5. Pumps NO. REVISIONS / AURMZAnM DATE BY <br /> ❑ ❑ ❑ 6. Double containment piping system �0 MASTER DRAWINGS 3/4/03 <br /> ❑ ❑ ❑ 7. Wells 1 PER CLIENT INSTRUCTIONS 11/12/03 DM <br /> ❑ ❑ ❑ 8. Leak Detection Systems UPDATED TO 01/23/04 STANDARDS 2/23/04 DW <br /> ❑ ❑ ❑ 9. other: <br /> PROPRIETARY SBC INFORMATION <br /> B. Permits and Agency Correspondence NOT FOR GENERAL USE OR DISCLOSURE OUTSIDE OF SBC <br /> YES No N/A THIS INFORMATION MAY ONLY BE USED BY AUTHORIZED PERSONNEL OF <br /> THE LOCAL GOVERNMENT AGENCY IN CONNECTION WITH APPLICATION FOR <br /> ❑ ❑ ❑ 10. Copies of signed permits (Health Care Agency, County or City Fire PERMITS AND AUTHORIZATIONS FOR BUILDINGS, CONSTRUCTION, AND/ OR <br /> Departments and Building departments, etc. as applicable) given ZONING CHANGES. <br /> to SBC Engineer <br /> DRAWINGS PREPARED FOR <br /> Q. An-Quilt Do ati n <br /> YES NO N/A CORPORATE <br /> ❑ ❑ ❑ 11. Contractor has submitted accurately marked set of as--built drawings MA 0 REAL ESTATE <br /> to SBC Engineer. <br /> PROJECT Tiff.£: <br /> ESCALON <br /> a <br /> 1812 COLEY AVENUE <br /> ESCALON, CALIFORNIA <br /> CLLC=ESCLCAl 1 UG---010 <br /> SHEET Tfil.E: <br /> UNDERGROUND FUEL TANK <br /> SUCTION SYSTEM <br /> PROJECT CLOSE---OUT CHECK SHEET <br /> ENGAGEMENT NUMBER: [TATE. 09/16/03 SML- AS NOTED <br /> CONSULTING ENGINEERS DRAWN BY. DW CHECKED BY. TP <br /> 2880 Sunrise Boulevard SBC AUTHORIZATION: SHEET: 8 OF. 8 SHEETS SHEET N0. <br /> �- Suite 206 SBC <br /> Rancho Cordova, CA 95742 DItAM4NG NO.: <br /> (916) 635-2444 F8 <br /> TAIT & ASSOCIATES, INC. (916) 635--2606 Fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.