Laserfiche WebLink
Memorandum -2- <br /> COMMENTS ON DEVELOPMENTS <br /> UP-00-19 <br /> 2. The Water Supply Facilities Impact Mitigation Fee will be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. The fee currently is <br /> $423.00 per 1,000 gross square foot of building as Commercial Service. The fee shall <br /> be automatically increased on January 1 of each year through the year 2005 at the rate <br /> of 7.66 percent. A credit may be allowed if it can be verified that the existing <br /> development on this site was in operation on or after April 30, 1991. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for <br /> Development Projects. Final Site Plan is required upon submittal of verification. <br /> GK:BN:mr <br /> PS-OK018-M 1 A <br /> E: Thomas M. Gau, Deputy Director/Development <br />