Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS TO DEVELOPMENT <br /> SA-01-30 <br /> 4. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $1,217 per <br /> 1,000 gross square foot of building designated as Commercial Service generated in the <br /> Stockton area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.) A <br /> credit may be allowed if it can be verified that the existing development on this site was in <br /> operation on or after April 23, 1990. <br /> (Resolution R-00-433) <br /> 5. The Water Supply Facilities Impact Mitigation Fee will be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. The fee currently is <br /> $456 per 1,000 gross square foot of building designated as Commercial Service. The fee <br /> shall be automatically increased on January 1 of each year through the year 2005 at the <br /> rate of 7.66 percent. A credit may be allowed if it can be verified that the existing <br /> development on this site was in operation on or after April 30, 1991. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> GK:BN:mr <br /> PS-1E100-M1A <br />