My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
COMPLIANCE INFO_2012 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:01:19 PM
Creation date
11/25/2019 10:41:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2014
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20.Test the tank atmosphere in the following order and record the results in the chart below. Refer to <br /> Table 2 in the procedure for specific tank atmospheric testing levels before and during tank entry. <br /> Time of <br /> Day: <br /> Oxygen , <br /> M <br /> Flammable <br /> Gas(%LEL) <br /> Toxic Gas <br /> (PPM) <br /> Tester's <br /> Initials <br /> Time of <br /> Day: <br /> Oxygen <br /> M <br /> Flammable <br /> Gas(%LEL) <br /> Toxic Gas <br /> (PPM) <br /> Tester's <br /> Initials <br /> Tank Entry Crew Signatures: <br /> Site Supervisor: Date: <br /> w <br /> Attendant: Date: <br /> Authorized tank entrant: Date: <br /> Part B — Post Tank Entry: Time: <br /> 1. All tools, equipment and work materials have been removed from tank. <br /> 2. Repairs have been inspected by Xerxes personnel. <br /> 3. Repairs have been inspected by customer or their representative. <br /> 4. End-cap(entry port) has been inspected by Xerxes. <br /> 5. Tank Tested: PSI DURATION <br /> 6. List any deviations from normal operating procedures that should be shared with the plant manager <br /> and field service coordinator: ' <br /> 7.After permit is closed, retain it with the service alert file. <br />
The URL can be used to link to this page
Your browser does not support the video tag.