Laserfiche WebLink
F. In-Tank Gauging /SIR i IR Ec ui1 tment; /Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no lank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perfomi leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes O No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes O No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes D No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section.H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): O Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Rrnatically <br /> o* For equipment start-up or aruival equipment cc ' ucation, was a leak simulated to verify LLD performance? <br /> IA (Check all that apply) Simulated leak rate: 3 g.p.h.; ❑ 0.1 g.p.h; ❑ 0.2 g.p.h. <br /> o* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> o* Was the testing apparatus properly calibrated? <br /> o* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> A <br /> o* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> A <br /> o* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the hirbine autoshut off if any portion of the monitoring system <br /> 2­1�/A malfunctions or fails a test? <br /> _LdT Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Yes O No* Were �i�tenison the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these cleticiencies were or will be corrected. <br /> H. Comments: <br /> mini <br />