Laserfiche WebLink
l <br /> -3- <br /> Community Development Department <br /> PA-1700051(SA) <br /> 10. A copy of the Final Site Plan shall be submitted prior to release of building permit. - <br /> 11. The developer shall provide drainage facilities in accordance_with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(5)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval,prior to <br /> release of building permit.(Development Title Section 9-1135) <br /> 12. This project falls within the definition of a Regulated Project as defined in either the County Post- <br /> Construction Standards Manual or the County Phase II National Pollutant Discharge Elimination <br /> System(NPDES)permit and shall comply with the following conditions: <br /> a. A registered professional engineer shall design a system or combination of systems to <br /> infiltrate,treat,and/or filter the 85th percentile storm as defined in the County's Post- <br /> Construction Standards Manual. The system design shall follow standards as outlined in <br /> the 2009 Storm Water Quality Control Criteria Plan or in the"California Association of <br /> Stormwater Quality Agencies"(CASQA)publications and comply with the conditions of <br /> the County Phase II NPDES permit. CASQA documents are available at ww%v.casga.org <br /> b. Owner shall submit a"Storm Water Pollution Prevention Plan"(SWPPP)to Public Works for <br /> review. A SWPPP preparation guide is available at the Department of Public Works. A <br /> copy of the SWPPP shall be maintained on the construction site and presented to any <br /> County,State or Federal employee on demand. The SWPPP onsite shall include all required <br /> records,updates,test results and inspections. The post construction chapter of the SWPPP <br /> must identify expected pollutants and how they will be prevented from entering the storm <br /> system The chapter shall also contain a maintenance plan,a spill plan,and a training plan <br /> for all employees on proper use,handling and disposal of potential pollutants. The example <br /> plans are available in the CASQA handbooks. <br /> c. A Maintenance Plan shall be submitted and the execution of a Maintenance Agreement <br /> with San Joaquin County shall be required for the owner/operator of stormwater controls <br /> prior to the release of the building permit. <br /> d. Owner shall be responsible for providing the County with an annual report of operation and <br /> maintenance of any system.The property owner shall also be responsible for the payment <br /> to the County of an annual system inspection fee established by Resolution of the Board of <br /> Supervisors. -- <br /> e. Standard Best Management Practices,for the type of development proposed,shall be <br /> incorporated into the site design. <br /> f. Wastewater shall NOT be allowed into the storm drainage system. <br />