My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012663
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6800
>
2600 - Land Use Program
>
PA-1700051
>
SU0012663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 1:29:40 PM
Creation date
11/26/2019 4:51:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012663
PE
2631
FACILITY_NAME
PA-1700051
STREET_NUMBER
6800
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231-
APN
19307013
ENTERED_DATE
11/26/2019 12:00:00 AM
SITE_LOCATION
6800 S EL DORADO ST
RECEIVED_DATE
11/26/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> -3- <br /> Community Development Department <br /> PA-1700051(SA) <br /> 10. A copy of the Final Site Plan shall be submitted prior to release of building permit. - <br /> 11. The developer shall provide drainage facilities in accordance_with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(5)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval,prior to <br /> release of building permit.(Development Title Section 9-1135) <br /> 12. This project falls within the definition of a Regulated Project as defined in either the County Post- <br /> Construction Standards Manual or the County Phase II National Pollutant Discharge Elimination <br /> System(NPDES)permit and shall comply with the following conditions: <br /> a. A registered professional engineer shall design a system or combination of systems to <br /> infiltrate,treat,and/or filter the 85th percentile storm as defined in the County's Post- <br /> Construction Standards Manual. The system design shall follow standards as outlined in <br /> the 2009 Storm Water Quality Control Criteria Plan or in the"California Association of <br /> Stormwater Quality Agencies"(CASQA)publications and comply with the conditions of <br /> the County Phase II NPDES permit. CASQA documents are available at ww%v.casga.org <br /> b. Owner shall submit a"Storm Water Pollution Prevention Plan"(SWPPP)to Public Works for <br /> review. A SWPPP preparation guide is available at the Department of Public Works. A <br /> copy of the SWPPP shall be maintained on the construction site and presented to any <br /> County,State or Federal employee on demand. The SWPPP onsite shall include all required <br /> records,updates,test results and inspections. The post construction chapter of the SWPPP <br /> must identify expected pollutants and how they will be prevented from entering the storm <br /> system The chapter shall also contain a maintenance plan,a spill plan,and a training plan <br /> for all employees on proper use,handling and disposal of potential pollutants. The example <br /> plans are available in the CASQA handbooks. <br /> c. A Maintenance Plan shall be submitted and the execution of a Maintenance Agreement <br /> with San Joaquin County shall be required for the owner/operator of stormwater controls <br /> prior to the release of the building permit. <br /> d. Owner shall be responsible for providing the County with an annual report of operation and <br /> maintenance of any system.The property owner shall also be responsible for the payment <br /> to the County of an annual system inspection fee established by Resolution of the Board of <br /> Supervisors. -- <br /> e. Standard Best Management Practices,for the type of development proposed,shall be <br /> incorporated into the site design. <br /> f. Wastewater shall NOT be allowed into the storm drainage system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.