Laserfiche WebLink
TANK & LINE KEYNOTES r.•• <br /> ALL TANK AND UNE INSTALLATIONS SHALL BE PERFORMED <br /> BY LICENSED C61-D40, C-36, GENERAL A OR GENERAL B <br /> WITH HAZARDOUS MATERIALS CERTIFICATE CONTRACTOR O TANK LEVEL MONITOR FAM <br /> THESE PLANS ARE DIAGRP"MATICEPRES N NATURE AND ARE NOT LLA COFFRQI,11 I'i��00AlE91„ INC. <br /> - INTENDED TO DE EXACT REPRESENTATION OF THE FINAL �2 3" MANIFOLD VAPOR RECOVERY. REFER 10 GENERAL NOTE /9 r V`� EVV, <br /> PRODUCT. THESE PLANS SHALL BE USED BY THE <br /> - - CONTRACTOR AS AID ONLY, CONTRACTOR SHALL BE O FILL RISER n <br /> RESPONSIBLE FOR THE COMPLETE INSTALLATION OF TANKS, R n C H T C C ,T O <br /> OF WPIPESORK. <br /> ALL EQUIPMENT ASSOCIATED WITH SCOPE O TUR81NE SUMP (TYP. OF 2). REFER TO GENERAL NOTE /7, THIS SHEET. D U h 1[. ln/ SiJ <br /> O2" FIBERGLASS PRODUCT-IN PIPING W/3" FIBERGLASS SECONDARY CONTAINMENT L A L R S <br /> PIPING. REFER TO GENERAL NOTE 18, THIS SHEET. - <br /> ONEW VENT RISERS, SEE DETAIL #6 SHEET TL.3. - - <br /> O2' VENT LINES (2 EACH). REFER TO GENERAL NOTE #10, THIS SHEET. <br /> _,..__"�__�__.r__.�__.�._.,�.._�__"_.____.__�__�___s_�__._.__ VAPOR RECOVERY RISER, REFER TO GENERAL NOTE /6, THIS SHEET. 3633 SEAPORT BLVD., SUITE C <br /> U9 9" THICK CONC. SLAB OVER UNDERGROUND FUEL TANKS. SEE WEST SACRAMENTO, CA. 95691 <br /> _ I DETAIL SHEET TL-2, CONTRACTOR IS TO VERIFY SLAB DIMENSIONS. PHONE: (Ole) 373'8700 <br /> ELEC. 10 DOUBLE WALL STEEL/ FIBERGLASS UNDERGROUND STORAGE TANK (TYP. OF 2) FAX' )816)ILt 371-020p0 <br /> CAR <br /> WASH <br /> TO GENERAL NOTE #2, #3, & 14, THIS SHEET. E-NI 1Ciaohsmet <br /> CAR WASH I 11 ANGULAR SPACE MONITOR (TYP. OF 2). REFER TO GENERAL NOTE <br /> - - I ((11 & §20. THIS SHEET. ©1999 LEX .COFFROTH & ASSOCIATES <br /> - �r `v I 12 MPD DISPENSER. REFER GENERAL NOTE /15, THIS SHEET. PLANS MAY NOT BE REVISED, COPIED, OR <br /> v 44 u� I 3 ISSION <br /> CANOPY COLUMN, SEE SHEET A9.1 FOR MORE INFORMATION. REUSEDWITHOUT <br /> EXCO FWRITTEN <br /> ARCHITECT. <br /> EMERGENCY $HUT-OFF SWITCH, SEE DETAIL 12/11.3 AND GENERAL NOTE #17, THIS SHEET, USED AR�jYr <br /> 15 CANOPY ABOVE, SEE SHEET A9.1 FOR MORE INFORMATION. �\vF.�EXA.NDPH T^p <br /> 16 2" VAPOR RECOVERY LINE * C-13842 cod <br /> 3 zy <br /> 6 lJr-i <br /> OI <br /> 1 � 1 <br /> �\\ @7 11 _ I CONTRACTOR: <br /> FILLNER <br /> ' ; w � �� GENERAL TANK & LINE NOTES CONSTRUCTION <br /> 10 II \``• /� E ,r I .E _ 9 I ALL TANK ANO LINE INSTALLATIONS SHALL BE PERFORMED BY A LICENSED CONTRACTOR. <br /> Wit;\ Z I I CONTRACTOR IS RESPONSIBLE FOR THE COMPLETE INSTALLATION OF TANKS AND PIPING. INV. <br /> j I 1 to I i 9 1 (:DTHESE PLANS ARE DIAGRAMMATIC IN NATURE AND ARE NOT INTENDED TO BE AN EXACT <br /> REPRESENTATION OF THE FINAL PRODUCT, GENERAL CONTRACTOR TO RELOCATE, MODIFY, OR <br /> r' .. 2 I I o TL.4 I 10 I MAKE ADJUSTMENTS TO PROVIDE A COMPLETE AND WORKING SYSTEM, CONSISTENT WITH THE 3633 SEAPORT BLVD. <br /> I - " I y INTENT OF THE DESIGN. CONTRACTOR SHALL USE THESE DRAWINGS ONLY AS AN AD, WEST SACRAMENTO, CA 95691 - <br /> I H \ I I ( L CONTRACTOR SHALL COMPLY WITH ALL STATE, FEDERAL AND LOCAL REQUIREMENTS. <br /> I O INSTALL TWO (2) DOUBLE WALL STEEL TANKS (TRUSCO SUPERTANK) AS FOLLOWS: Phone: 916-372-1985 <br /> II/� /� ONE (1) 20,000 GALLON UNLEADED, ONE (1) 15,000 GALLON SUPER UNLEADED Fox: 916-372-0911 <br /> W TANKS TO BE SET 48" MINIMUM BELOW FINISH GRADE. <br /> DEVELOPER: <br /> LLIO TANKS SHALL BE INSTALLED PER TANK MANUFACTURE'S RECOMMENDATIONS & SPECS. <br /> L <br /> r14 / 4 TANK BURIAL DEPTH SHALL BE DETERMINED BY THE FOLLOWING METHOD. <br /> x I WIN <br /> A STARTING WITH THE FARTHEST PIPE BURIAL, WHETHER VENT LINES FROM <br /> t 11-- -- U - - - --=- �r� U_ / _ _ _ _ I W VENT RISERS OR PRODUCT LINES FROM DISPENSERS, ALLOW 1/4" PER <br /> - - - <br /> VR-S_ T7 I FOOT SLOPE BACK TO TANK TURBINE CONTAINMENT SUMP. <br /> Z <br /> �S I CONSTRUCT A REINFORCED 9" CONCRETE SLAB, SET MANHOLE COVER 1-1/2" ABC IE SIM. <br /> (SLAB CROWN 1--1/2' MINIMUM CONCENTRIC). <br /> r _ INSTALL BLACK IRON RISER FOR PHASE II VAPOR RECOVERY AND VENT CONNECTIONS WITH <br /> I . 15 --l�g,�-3"0 Z O7 INSTALL TOTAND <br /> HORSEPOWER SUBMERSIBLE PUMPS WITH LEAH( REVISIONS <br /> 1 <br /> DETECTORS OR EQUAL (MANHOLE COVERS TO BE WATERTIGHT). <br /> ALL PRODUCT LINES (2') AND SECONDARY CONTAINMENT (3'� PIPING SHALL BE 100% NO. DESCRIPTION ; DATE <br /> H METHANOL COMPATIBLE. SMITH RED THREAD IIA OR AMERON ALCOHOL IS _ -- I <br /> 13 CITY PLAN CHECK 9/14/99 <br /> ❑ I I ❑ r I SPECIFIED. ALL GLUES SHALL BE PERMATED 51-D. ALL VENTS IJP TO - -- - - <br /> 'I 5 _ I GRADE SHALL BE 100% METHANOL COMPATIBLE. ALL NEW PIPING TO BE <br /> Od <br /> INSTALLED PER MANUFACTURER'S SPECIFICATIONS. <br /> I. ------ <br /> N O9 INSTALL 2" MANIFOLD VAPOR RECOVERY LINES. SLOPE 1/4' PER FOOT INTO MANIFOLD <br /> 16 I 3' VAPOR RECOVERY UNE, SLOPED 1/4' PER FOOT INTO LOWEST GRADE TANK. REFER' - _ <br /> AHI C-STORE �I I TO SCHEMATIC DIAGRAM ON DRAWING. <br /> III Y I 10 INSTALL TWO (2) 2' SINGLE WALL VENT LINES (ONE FOR EACH TANK COMPARTMENT). -- _ - - <br /> SLOPING 1/4" PER FOOT MINIMUM BACK TO TANKS, PIPING MATERIALS TO BE SAME AS <br /> ` <br /> t�cL�- I PRODUCT PIPING BELOW GRADE, GALV. AT VENT RISERS ABOVE. '❑ I I. I 2"Q 13 III �Z'0 ------ I 11 INSTALL ANNULAR SPACE MONITOR (MANHOLE COVERS TO BE WATERTIGHT). <br /> I <br /> 12 PROJECT TO BE SUFFICIENTLY BARRICADED DURING CONSTRUCTION TO PREVENT ANY <br /> UNAUTHORIZED TRESPASS (VEHICLE OR PEDESTRIAN). <br /> 13 INSTALL GUARD POSTS PER DETAIL 8 ON SHEET TL-3 <br /> QD CONSTRUCT DISPENSER ISLANDS AND DRIVE SLABS AS INDICATED ON DWGS. <br /> I5 NOT USED <br /> 6) REFER TO SUPPLEMENTAL FUEL DRAWINGS FOR ADDITIONAL INFORMATION AND SPECIFICATIONS. DRAWINGS PREPARED FOR: <br /> FWALHiALTH DIVISION I �,-Y---- - jJ /. // i /_ ) '� 17 EMERGENCY PUMP SHUTOFF SWITCH BETWEEN 15' AND 75' FROM PUMP ISLANDS. SEE SITE FILLNER <br /> t. Tn r Ircr �PYCGt fL RI l/Yr� /0 p' /G G�1/� � h>jrt, Y /!<z �Kti n ff 7� Y lur//fy /v Gr/I I PANS. <br /> PC oOx ,X,JW Kon,f;Q, '15201 0388 i 2Y 7O7u� I 8 PLEASE NOTE: COORDINATE INSTALLATION OF PIPING, CONDUITS, AND DISPENSER BOXES TO TANK AND LINE <br /> �� �o et�jY Us� 60 v7(Ad Il <br /> hone. L�Ld) 7at13420 3) U l�� -cr �iff/ Q// C' U �✓ �Sf<�7 T�/ �3 6� ��� T <br /> �("l Ur�� ��"` `� /i7US fG ✓ I AVOID CONFLICTS WITH CANOPY COLUMN FOOTINGS. <br /> �J .T�d/P/�ri�• /� i?�r' 19 INSTALL GILBARCO EMC INVENTORY CONTROL AND IMERSTRIAL LEAK SENSING STOCKTON <br /> 0 " 1, 4�1 _� �J/ 7�J /' � �JV /J/�CC�G/ �� h��� , L SYSTEM PER MANUFACTURERS INSTRUCTIONS. SEE MANUFACTURERS FOR INSTRUCTIONS. v <br /> wltn c al Aomatks ,fZ�✓. L' /�//6' !rr C�r.' r7✓ />:Gl,� va' ' /1/i G, I/ ,� <br /> SEE ELECTRICAL AND SITE, <br /> I 1 u..ftVr uVB56a Flelit3 B . �� /'Ohl"/!/CfGY//fyJ <br /> 20 INSTALL ALL NEW PIPING PER MANUFACTURER'S SPECIFICATIONS, <br /> 'Rum <br /> n:;uk, CORNER OF LINCOLN STREET AND <br /> -._. ------- ---- I 21 ALL PIPING, COUPLINGS, SEALANTS, ETC., SHALL BE COMPATIBLE WITH EACH OTHER AND WEST CHARTER WAY <br /> WITH,7 PRODUCTTO BE STORED STOCKTON. CA ' <br /> 1 / t �• "'��'_---""-r-"-••'--'--"`-�- 22 ALL TURBINES ARE TO BE WIRED INDIVIDUALLY INTO MONITOR CONTROL SO THAT AN <br /> By.• - •---...� r llY/ dJ,J!(>' f'y,Yy/ j ACTIVATION OF THE SUMP MONITOR WILL SHUT DOWN THE TURBINE FOR THAT TANK. <br /> o-Aporo I of thea? „I in, xto Ids only to that <br /> which Shoran >ind dw,s,Jt d , r TPon but <br /> f1L.id`i T 131:.tlof re ) apovr,�-,' t t} ,, ;,''9+1 <br /> q <br /> SHEET TITLE <br /> Locuioraln ncs,G. TANK AND LINE <br /> WEST CHARTER WAY SITE PLAN <br /> TANK & LINE LEGEND <br /> _ . _ U .— _ . _- . _ — — _ — UNLEADED DATE: 8/27/99 SHEET N0. <br /> - - - - -5 — — - — - SUPER UNLEADED PROI.j: 99-0804 <br /> --- ------VR--------- - -- VAPOR RECOVERY SCALE 1'�10'-O � � � <br /> NORTH -----------------v------ ------------- VENT LINE DRAWN BY: BUR <br /> CHECKED BY: JSC <br />