Laserfiche WebLink
r <br /> Aegis plans to install a passive skimmer in well MW-3 during the first week of December <br /> 1992 to collect floating liquid hydrocarbons. Additionally, Aegis plans to perform hand- <br /> bailing of liquid hydrocarbons from MW-3, if present, bi-weekly for 8 weeks (December <br /> 1992 through January 1993). <br /> We appreciate the interest of the SJCEHD in this matter. If you have any questions, <br /> please call me at (916) 782-2110. <br /> Sincerely, <br /> aC• 7oPkZ5en-,- <br /> David L. Poulsen <br /> Project Geologist <br /> DLP/law <br /> cc: D. Kirk, Shell Oil Company <br /> E. Thayer, Central Valley Regional Water Quality Control Board <br /> 90-020T.LTR -2- <br />